Get matched with top Flooring Installation in Stony Brook

There are 281 highly-rated local flooring installation.

Flooring reviews in Stony Brook

  • A
    Selective Sculptures
    Selective Sculptures just completed a full remodeling of our forty year old kitchen. They did an exquisite job. If we were awarding ���stars��� here and five stars was the highest I would ask to assign six to everyone involved, Brian, Scott, Mike, Don, Victor, Eddie and Herrin all in particularly and for their individual contributions. They took a forty year old ���builders��� kitchen and gave us a stunningly beautiful country style kitchen that we dreamed of; inclusive of every detail we wished for and they did it at a price that was more than fair and in a timeframe that was absolutely agreeable. They are very skilled craftsman. They were all always welcome in our home because not only did they have tremendous crafting skills, each had a wonderful personality and were a pleasure to have in our home. They left the worksite spotless each night prior to their departure. They were very respectful of the fact that they were working in our home. The ideas they put forth to solve several design problems were genius. All things considered, I would not hesitate in the least to recommend Selective Sculptures to anyone considering any type of home restructuring job. There are a gaggle of contractors out there but none that will give you the type of design and work precision that Selective Sculptures can.
    - Diane O.
  • A
    Pristine East End Contracting
    Nick DeRosa using old world craftsmanship combined with an in-depth knowledge of modern building materials and techniques produced unbelievable results. Faced with a daunting task of trying to rebuild our home after a devastating flood, Nick provided guidance not only as to how to get our home back in shape but also providing guidance and support in our dealings with the insurance company as well as the bank. This is the second time that we have used Nick and his team this year. Project involved rebuilding the upstairs bathroom, upstairs study, upstairs hallway, downstairs kitchen, as well as downstairs hallway. The total cost of this project exceeded $20,000, including construction, plumbing, and electrical. This does not take into account the money that was paid by the insurance company for the clean-up after the flood as well as the removal of asbestos that was discovered during the course of clean-up. This added another $15,000 bringing the grand total to $35,000. The final end product far exceeded our expectations and we anticipate contracting Nick to perform additional work sometime in the early part of 2017. Overall, I would rate Pristine East End Contracting an "A". Specifically, Nick DeRosa: 1. Provided us with a detailed quote in which he clearly documented both time and materials; 2. Completed our project on time and at budget; 3. Worked exclusively on our project without the distraction of other commitments; 4. Coordinated effectively with other tradesmen, including John Julius Electric as well as Atlantic Plumbing; 5. Maintained a safe and meticulously clean work area free from dirt and construction debris; and 6. Exhibited politeness and professionalism in his dealings with us, his helpers, as well as other tradesmen.
    - John L.
  • A
    Selective Sculptures
    With me, it���s not just about the job, it���s about how these guys made me feel. I feel important to them, respected and a priority. I feel as if they are interested in my daily opinion. They want to please me as a customer. They respect my feelings, my suggestions and opinions. From start to where we are now, I am ahead of schedule on the kitchen. They are here when they say they will be here. They understand I am living out of the garage and dining room. They respect that I have a child who has needs while they are here. They stay past 5pm until the work is done. They check up on my progress daily. Mike and Dominick come to see the work often. I can trust their workers with my house/property when I am not home. I can go to work and not worry about what���s happening with my house. I also don���t have to pay all at once. They broke up the entire amount into percentages so I pay as we go through the weeks. They schedule all the work/specialists so I don���t have lag time or issues getting steps completed. They make sure my job is up to code. And most importantly, they clean up before they leave, inside and outside. I can���t tell you how important that is with a child and a cat. I don���t have to worry about him getting into the tools or garbage. I also trust that they will do what it takes to keep me satisfied as a customer. They listen to my concerns/comments as you can see each day whether at my home or over text (my preferred method of communication). They came up with a timeline that was loose so we could tweak plans when necessary and so I could plan my life around the renovations. I am pleased at the progress made so far and look forward to using my new kitchen! See what's gone on below! WORK SCHEDULE SO FAR July 17, 2016, Monday 6:45am Dumpster arrives July 18, 2016, Tuesday 8am the crew of 5 men arrived. The put plastic up around the back room and doors so the sawdust would be contained. They had the entire kitchen demolished by 3pm. The dumpster was filled. They vacuumed and left. What was planned for 2 days took 1. July 19, 2016, Wednesday Electricians and Plumbers came 8am. They found some areas not up to code and fixed the problems. Left at 4pm. I believe Mike arranged to have the specialists come at close times. It seemed when one left, someone else pulled up 30 seconds later. Talk about SERVICE! HVAC came at 4:45pm to look at what items would be needed and promised to see me the next morning. I was amazed so much got accomplished in such a short time. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. I gave him another check after he reviewed some of the financials with me. He makes it easy to not have to have all funds upfront. I feel more comfortable with this way. He plans it in percentages. Sometimes there are additional expenses such as more electrical work than was planned/billed for so that was an addition but these things are expected. I am trying to go with the flow. Changes happen. July 20, 2016, Thursday HVAC Mike came at 7am so that the wall guys would not have him in the way. We decided together to move two vents from the floors to the walls. He updated the heating vents and spent 3 hours making it to code. Walls went up as HVAC Mike worked. Ceilings were put up and 2 coats of Spackling. James, Jorge and Freddy did a terrific job. Neat, fast and looked great. I was very pleased with the work. Mike came to the site to clarify the next stage of work and find out how we felt about the work so far. Framing and Sheet rocking was planned for 4 days. It took 2. We were ahead of schedule. July 21, 2016, Friday James did a third coating of Spackle. He painted a first coat of my Soft Fern green color and the ceiling white. Dominick came by to check on the work/progress and see how we were doing. James vacuumed and cleaned up before he left. My husband found some areas he wanted addressed and I texted his concerns to Dominick. Dominick shared it with Mike. I didn���t want to bother Mike since it was the weekend, but Dominick felt our concerns were important. They were addressed Saturday morning. July 22, 2016, Saturday 8:30am. Eddie and Javier arrived to work on the floors. They nailed down the wire mesh which was a job that took all day. Tile needed to be cut as well. They left the place clean and neat. July 23, 2016, Sunday DAY OF REST July 24, 2016, Monday 8:45am. Eddie and Javier needed to mud the floors to make them level which they were not. One side needed to be higher than the other. Eddie and Javier worked very hard and left at 7pm after they cleaned up. It was a very long day for them. Mike made arrangements with the appliance store to deliver on August 1. July 25, 2016, Tuesday 8:45am. Eddie measured and laid the time on the leveled floors. It was a terribly hot day and Javier had to lug cement and cut tile in the heat. I felt so bad for him. He never complained and worked so very hard. The floors looked great but Eddie felt like it was not looking right so he lifted three rows of tile and did them again to get it right. He felt he wanted perfection and I appreciated that. I complimented him and shared that with Mike when he came to see the progress. They left at 5:30pm and planned to come back for the Backsplash when it was time. 4 days were planned to do the job. It took 3. July 26, 2016, Wednesday Freddy and Jorge came to work on making saddles and putting up molding around the doors and window. Freddy was so funny. He kept cleaning and I told him to not worry about the dust on the doors, that I would take care of it later. He was so concerned about keeping the place clean for me. I told him it was impossible since there was so much cutting of wood. Jorge spoke to me about the saddles and I made suggestions. He asked my opinion and he made it to my specifications such as overlapping the saddle to the stair for safety. They cleaned up and I was pleased to find out we had several days off to have family time instead of having construction. July 27, 2016 Thursday Jorge and Freddy came to complete the saddles and woodwork. Once again, outstanding! I left them alone all day while I went to work. I had no worries. I also knew Mike stopped by often at the site to check on progress but I trusted them completely. July 28-31, 2016 REST August 1, 2016, Monday Cabinet specialists Anthony and Paul arrived. They worked from 8:45-5pm. They put cabinets up, cut and measured over and over. They said, "Measure three times, cut once." They were very nice, knowledgeable, spoke kindly to my son and had a smile and a kind word to me most often during the day. August 2, 2016, Tuesday Cabinet guys arrived at 8:45am. I went to work and when I came back most of the cabinets were up. Since the floor was 3 inches higher than anticipated, they called Scott at Selective Sculptures to order a smaller cabinet so they would not have to cut it. The cabinet would arrive Thursday. August 3, 2016, Wednesday I called Mike to tell him I am taking a day of rest. August 4, 2016, Thursday Cabinets are done! Paul and Anthony arrived at 8:30 and they were completed by 5pm. They vacuumed and touched up the cabinets. They put the shelves in for me and discussed how to care for my cabinets. They put up the crown molding and asked my opinion about where I wanted the handles to go on the cabinets. Mike came by to see how it was progressing, to get a check from me and to plan the coming week of work. He's planning on my refrigerator and stove going in and working on Monday. As you can guess I'm tired of washing dishes in my bathroom and am grateful it's going to happen so quickly!
    - Meredith K.
  • A
    Stylish Floors N' More Inc
    Kamal (owner) knows what he is doing and will give you the benefit of his many years of experience, but he is easy to work with and will listen respectfully to your suggestions.  I would , and have, highly recommended him to my family members who have also had great experiences with Stylish Floors N' More.
    - rochelle h.
  • A
    Allied Construction Corp

    I had worked with Allied before, so I had them back!�� Tom, the owner/manager,��came out and gave me an initial estimate.�� Then whenever I had any additional questions, Tom came again to my home personally and/or picked up on the first ring when I called him and/or immediately called me back!��He was very hands-on with the project; working with the crew and/or stopping by daily to check on the quality and progress of the work!�� His crew, led by foreman Manuel and including workers Jimmy and Valentino, were amazing!�� They all have a lot of experience, knowledge, and expertise in the construction field!!! These men came every day on time and worked hard all day to get the job done!!�� They were punctual, professional, and meticulous! Manuel was so helpful in making design suggestions and trouble shooting! They worked so hard that they finished the job in four days instead of the estimated 6 days for completion!!! Manuel and his crew and their work was so meticulous with the details, as well as being kind and patient with my pickiness!!!��They answered any questions I had and kept me��in the loop through out the entire process!!!!�� Finally, when the job was completed they did a complete and thorough clean up of��the premises.����My bathroom came out awesome!!! Imagine a Cape Cod/Nantucket-styled dream bathroom come to life!!! Tom even suggested the bathroom paint color and it looks awesome!!! I have gotten nothing but compliments on the bathroom from friends and family since the work was completed!!!�� I would definitely recommend Allied, especially Manuel and his crew!!!�� In fact, I am putting in a new floor in my den in October and have already booked Allied again and requested Manuel and his crew to do the work!!!�� I will try to attach photos to this review but I'm not that computer savvy, so if you would like to see the finished project and the photos don't make it on to the review, then ask Tom, he has photos!��


    - alexis c.
  • A
    Heritage Floor Sanding LLC
    From start to finish this company exemplified professionalism.  They were able to provide a prompt appointment for the estimate and arrived on time.  They explained clearly what was entailed in completing the repair and how the refinishing process would be conducted.  The job was scheduled as a two day process.  They arrived on time, prepared the area carefully and as a result, negligible dust was created in the house.  The repair was done to perfection and the refinish job makes my old wood floor look like new.  It adjoins a recently installed prefinished wood floor in the dining room.  Heritage made the floors match beautifully.  I would highly recommend this company to anyone.
    - Eleanor L.
  • A
    Allied Construction Corp
    Typically I find home construction jobs a source of pure aggrivation.  Not so with all the work done by Allied Construction.  This extensive project was an absolute pleasure.  Tom and his crew were professional, punctual, skilled, and respectful.  They treated my home as if it were their own and kept stressing they wanted me to be happy.  Their workmanship was impeccable.  The complex design on the tile foyer floor was done with such patience and attention to detail.  I receive comments all the time about how beautiful it is and that it looks like a work of art.  They offered suggestions for details to enhance the project (at no extra charge) and were mindful of my need to have the project completed by the holiday.  It is rare today to find people who take pride in their work and aim to keep their customers happy.  Allied Construction is just such a company.  I look forward to my next project and will be calling them again very soon.
    - Eleanor L.
  • A
    YOUR FLOOR STORE
    They are wonderful and they are fantastic. They are phenomenal. I've been with them for like 20 years. They go over and above the call of duty. I can call them on something and they'll say to not worry and they'll come over. They are just great. They are very fair because I've worked with them for years. They are terrific. They are honest, perfect and very fair.
    - Janice S.
  • A
    Heritage Floor Sanding LLC
    Jim and Howie are great guys to work with. Our floors look brand new. They are prompt, friendly and courteous.They showed on time and did excellent work. I would rate them an A++. and recommend them to anyone
    - Paul H.
  • A
    Branch Services Inc
    Branch Services removed all wallboard from the bathroom walls, ceiling and all bathroom fixtures. They cleaned all mold and refreshed the environment. They installed new walls, flooring and ceiling, all new bathroom fixtures, including toilet, tub, shower stall, vanity and double sinks. They also did electrical work, including hi hats, a shower light and a heavier exhaust fan. We provided the fixtures and they provided all other materials and all labor.

    This project went better than any home project I have undertaken in the past and I have redone a kitchen and three bathrooms at other times. Everyone involved in the project was outstanding. They were always pleasant and courteous, appeared on time, worked hard, cleaned up after each day and stuck to the agreed schedule for completion of each step. Chris, the company coordinator was very professional and provided us with everything we expected at the highest standards.
    - patricia b.
Join Angie's List to view provider's name.
Join Angie's List Now To see all 281 highly rated companies in Stony Brook

Explore Our Solution Center for Helpful Flooring Contractor Articles

Go to the article: 

Tile Flooring Choices, Descriptions and Costs

.
A man uses a pry bar to remove tack strip from a floor.
Go to the article: 

Choosing Flooring for Rooms That Get Wet

.
Tile flooring in a bathroom
Go to the article: 

How Much Should My New Floor Cost?

.
hardwood flooring cost

Flooring Installation in Stony Brook

Companies below are listed in alphabetical order.

To view top rated service providers along with reviews & ratings, JOIN ANGIE'S LIST NOW!