I hired him to remove a lot of brush, small trees, scrap wood, and dead limbs.
I walked the property with the owner and showed him everything that needed to be done. It was a huge amount of work so I was really surprised when he said that he could get it done in a day and a half. He charges $1400/day and after 2 days there was still a fair amount of work left so I went ahead and paid him for 3 days with the understanding that he'd complete what we'd talked about. He worked up through the third day but there was still some work left. I called him 3 times and he finally came back out to look at the work that was left but got really upset with me. I feel like there was a misunderstanding. I was under the impression that I was paying him for the three days and that if there was any work left after that, I wouldn't be charged.