Remove old tub and shower walls, install new tub and shower wall. Re-plaster as needed. Reuse shower doors and faucets.We had to order new faucet because of inproper installation ,from another plumber last summer. The shower doors that had just been put in, needed new top and bottom rails .
We received a quote in late may and then ordered the work about the middle of June. We had a special order for the shower/tube walls that into late July, were still not in . We then agreed with affordable plumbing, to let them do the special order on site.The work finally progressed with a few more problems. When the installer showed up ,they had the wrong walls. This was corrected that afternoon. We then discovered that the doors we were reusing needed longer top and bottom tracks . Reorder took another 5 to 6 days. We were very happy with the final product and the excellent installation. To do over again I would make sure up front that the product was readily available and all the measurements were correct. We should have had an onsite measurement ,instead of using prior measurements from previous quotes.