Find top-rated Service Providers

Find Top-Rated Redwood City Home Interior Contractors

There are 126 top-rated home interior contractors in your area.

Zip Code
Join Angie's List Now To see all 126 highly rated companies in Redwood City

Interior Design reviews in Redwood City

  • A
    Great! Jack was extremely helpful, personable, professional and punctual. He had very good suggestions and his fabric selections were great. It was a very personal process - never felt like just a nameless client! We would use the Yardstick again for any future window treatments.
    - Andrew R.
  • F
    Working with Everlast was a negative experience and I can't recommend them. My project was complex, involving full remodel of kitchen/bathroom/living room/laundry room, building a ground floor addition, removing a main structural wall, and replacing the back deck. We're home reno veterans so I understand about unexpected surprises and reasonable industry-standard quality. I believe that Everlast did try their best and they are nice guys overall, but this project was beyond their ability to handle and they fell far below the level of service and quality they promised to get the contract. From the start, the project manager was inexperienced and couldn't get things organized or prioritized, the crew was not supervised properly and adequate instructions were hardly ever communicated to them, work was rarely done right and usually had to corrected multiple times, and deadlines were overpromised and missed everywhere. There were major mistakes - shortcuts on plumbing connections that caused our upstairs sewage to clog, structural beams welded too narrow to install the patio sliding doors, the floor beams they built are not level so we now just live with a few bouncy "trampoline" spots on the ground floor, and shortcuts on the back deck so that our ramp and dock actually ripped away from the back deck because of insufficient support. The original 3 month estimate dragged out to 13+ months which was a big problem given we were living upstairs in the house and found out I was pregnant right after we started the project. After trying to make it work for the first few months, I asked for the project manager to be replaced with someone more experienced, which Everlast did not do, so I ended up having to take over managing most of the project (while still working a full time job). We also had to pitch in on construction work ourselves so we could get basic functions back and the crew out of the house before the baby arrived. I started having to bring other contractors in to complete separate portions of work like the new staircase or replacing the back fence, given Everlast was so behind schedule and because their change order quotes would sometimes be 4x higher than other contractor's quotes. I tried to get adjustments reconciled as we reduced Everlast's scope of work with the baby's due date getting closer and closer, but the owner Ariel wanted to be paid every installment payment in full. He said he wanted to leave all adjustments to the end, or sometimes he'd say he'd stop work if we didn't pay the instalment in full - so we had very little choice of course. Trying to get the house finished after the baby was born was frustrating too, and after many broken deadlines we finally ended up terminating the contract. I hired other contractors to finish the project and correct Everlast's mistakes. But the drama didn't end there - although I paid Everlast for the work they did complete, Ariel still wanted to be paid the full contract price, didn't want to acknowledge we had to reconcile a long list of adjustments that had built up, and threatened to file a lien and foreclose my house. The deadline to validly file a lien has now expired for Everlast. They did mail us a lien document (that was dated after the deadline), but so far it doesn't look like the lien was actually filed with the county. If Everlast ends up filing later knowing it's an invalid lien, that's really bad and I'd be entitled to ask the court to remove it and force Everlast to pay my costs. I wanted to share a true account of my experiences with Everlast to let other homeowners decide if this is the kind of home renovation experience they want for their project too.
    - franny l.
  • B
    They sent someone out within days - other companies we called couldn't send out to give an estimate for weeks. Technician arrived on time. They arrived to give an estimate but also left a window of time so that if we wanted to go ahead with it they could install it then and there. There wasn't a high pressure sell. We got estimates for other things - skylight, whole house fan. We didn't not want to make a decision about those things right on the spot.
    - Maureen B.
  • A
    we have discovered water damage, M&M construction were amazingly patient and considerate throughout the whole process of working with the insurance, all went much easier and faster than expected. we are very happy. Thank you for the good work!
    - Bishop G.
  • A
    Everything was done professionally, efficiently, and in a timely manner. I was impressed with the communication also. Working with Baron Construction was a very positive experience compared with working with our previous contractor. We would definitely recommend Baron Construction.
    - Colleen W.
  • A
    Our project supervisor Ofir was excellent. He was easygoing, generous, skilled and very fast to return calls. Ofir and the crew stepped in to do our entire kitchen remodel few months ago. During the Kitchen remodeling project, they also replaced several sliding doors and painted the exterior of the house. Everything was done quiet fast, clean & well-organized! We were surprised at how everything was going according to the main plan and design. Our completed kitchen remodeling project was finished on time including the 2 additional tasks that we added during the work (Paint and sliding doors). Our kitchen dream become a reality now. We will definitely call a quality construction again for another remodeling project without thinking twice!!
    - Gino M.
  • A
    The project suffered delays just like many remodels. But these delays were outside the purview of Morgan Construction. Dan Morgan held up his end of the bargain and went out of his way to communicate and get things done. He is a prime example of "promise less, deliver more". The pricing below does not include things like cabinets, mirrors, tile and some other miscellaneous items.
    - John J.
  • A
    We will go back to them for further stuff if we need some cabinetry or furniture work, we will definitely go there. The owners knowledge of everything involved in the work they do stood out to me. He is definitely a hands on craftsman-owner combination. His responsiveness and willingness to help come out and make an adjustment so that the work he had done met our needs. It's not inexpensive but you pay for the quality. I would absolutely, definitely use them again.
    - Sandy F.
  • A
    Many thanks to SOD builders and mainly Allen and the actual people that were involved in our remodeling, for the excellent remodeling job that they did at our house. The remodeling project included the full remodeling of our house and it included the kitchen. Bathrooms, back yard, front yard, bedrooms and hallways. The work changed completely the house and we love it very much! Allen and his crew did such a professional work and each part of it was done with extra care and attention. During the work and even after, Allen was there for us to answer any of our questions or concerns, meeting us at various vendors and helped us selecting and choosing all the materials, appliances and paint. He used his skills and experience to advise us on all the many available options for many issues that raised during the work! We would refer SOD builders to anyone looking to convert their house space into something stunning!
    - Stephen B.
  • A
    It was a pleasure working with Sal Azzolino at Argo tile and stone, from our very first meeting in which he so clearly explained what the various steps would be to the very end when the work was finished. After looking at various materials, we settled for the Volga blue granite for our countertops, which actually is black, but in the right light conditions shows splashes of shining blue. For the whole first floor we had a french limestone(24x24) tiles with small gold travertine in between For the guest bathroom we choose a very dramatic pakistani onyx slab on the sink top and backsplash. For the master bathroom we had slabs of italian marble, I think the name is "fior di pesco" on the walls and a spanish marble pink in color on the cabinets . The fireplace was imported from France of solid limestone. The patio was done in italian travertine and for the circular driveway we picked granite pavers. Sal was able to keep us informed throughout the project and able to solve the various glitches that come with such work. His work was punctual,clean and meticulous and was able to coordinate with the different subcontractors. The work was finished on time and on budget(unheard of in this business) Many people often comment that my house is a real masterpiece, well good part of this credit is definitely deserved for Sal Azzolino and Argo tile and stone. Hope to add pictures in the near future
    - michael i.
Join Angie's List to view provider's name.

Home Interior Contractors in Redwood City

Companies below are listed in alphabetical order.

To view top rated service providers along with reviews & ratings, JOIN ANGIE'S LIST NOW!