Get matched with top Countertop Kitchen Installers in Raymond

There are 4 highly-rated local countertop kitchen installers.

Countertop Installation reviews in Raymond

  • A
    CHIEF TILE & MARBLE
    Frank was a pleasure to work with. I went to Modesto and chose my materials and he picked them up, got the counter ready to go in, and installed. It looks fabulous!
    - Elaine D.
  • A
    Unique Builders
    Excellent. I wish Dan still lived in the area because I cannot find a contractor as good as he is since he has moved.
    - Scott W.
  • A
    TAYLOR'S TOPS
    We needed the to have as little down time as possible since this is the only bathroom we can use for our daughter's special needs. I called Dave Taylor at Taylors Tops for an estimate because we had such a good experience with him when he made and installed our kitchen and master bath countertops about 6 years ago. Dave was at my door within 20 minutes of my call. He was ready to measure and had several samples of materials I could choose from. From the estimate to completed installation including plumbing, was less than a week. Taylors Tops has always been very professional, friendly, and we love the quality of the product he provides.
    - Susan G.
  • A
    TAYLOR'S TOPS
    Dave did a great job on my new counter tops. If I ever do this again he will be the first guy I call.
    - Matthew H.
  • B
    Master Granite and Marble
    I went to their office/showroom last Tuesday at closing time.  I picked out a marble and a granite as possible choices.  They (Ruben) said they could have either one installed that same week.  I gave them a $300 deposit for the job, and left with samples of the marble and granite. Thursday I called with my choice, the marble.  Ruben came out Thursday and measured the vanity.  I asked about the installation day.  Ruben said early next week.  I called this Monday.  Ruben said the install would be Thursday.  I called Thursday.  Ruben said it would be Friday.  Finally, Friday became my install day. The installation was uneventful, and professional.  First a piece of plywood was cut to serve as base for the marble, and was screwed into the vanity.  Then the marble was cut to fit.  The marble was glued in.  The 4" back-splash and side-splashes were glued in and caulked.  Total time about 2.5 hours.  The job looks good.
    - dennis g.
  • C
    ANC CUSTOMS
    Started good. Origional quote was $10,000 which I had no problem with. The project was to take about 4 weeks. They ran into an issue with Lead paint which ended up costing them about 3 days labor. When putting up barrier to remove the Lead paint the barrier was held up with 2x4's that poked 2 holes in the bedroom ceiling and 2 more in the hall ceiling that wasn't being worked on. Later I found out they were going to cover up my origional insulation on a exterior wall which in the quote had a cost to replace it. I had to bring it to their attention to get them to replace it. During the remodel which ended up taking 6 weeks instead of 4. I saw 3 to 4 employees get fired from their employment (not my issue I just want my job completed). During construction it noticed that my attic fan wasn't working and due to having a injured back at the time I asked if they could replace it. I was told the fan itself was about $100.00. I said ok. Later I found out my quote had jumped from $10,000 to $10,500. They said it was due to rewiring the fan. My bathroom exhaust fan (less than 1 year old)got shorted out due to their wiring , which they did replace. On top of the quote I still paid for all the paint and primer to cover the work that was done, the closet doors and metal trim for the shower edges. Per the quote I purchased all the tile for the shower, the floor and the vanity top. As the contract stated when each of the 4 checks were requested I had the check for them within 1 to 2 days without failure. The first 2 checks were actually paid together to help cover the permit. When things were finally coming to a close and we were doing inspections as we were asked to do, they started demanding their final check before they had finished the touchups. We were told if I didn't pay them in full they were going to contact their Attorney and start processing, was told 3 or 4 times. I still had the final check delivered to them on the second day. Also it was noticed the new $200 toilet I paid for in the quote had a chip in it, which they came back out and patched and the new vanity that was purchased had a chip in the cabinet in which we noticed.  (Though the quote said they were going to build and didn't) They installed it without letting us know that it wasn't built but bought.. They told me to make a list at end of each day, then his wife came and told us that we shouldn't be doing that even though they told us to.  Also when contract was signed Mark told us he would give us receipts, (should have put in contract but didn't, we trusted him) and at the end of the job his wife said they don't do that. So we didnt get receipts. Don't be mistaken bathroom is alot nicer then it was originially, just had alot of issues.
    - David L.
  • D
    H & J Handyman
    3/2015 Installed a bathroom door and damaged the wood floor threshold.  Asked him to fix it and after waiting weeks, he said he would not waste his time trying to find the correct piece and replace it.   All the work was done very slowly, and mistakes were made that had to be corrected.
    - Steve M.
Join Angie's List to view provider's name.
Join Angie's List Now To see all 4 highly rated companies in Raymond

Explore Our Solution Center for Helpful Countertop Installation Articles

Go to the article: 

What are the Benefits of a Granite Countertop?

.
Go to the article: 

Pros and Cons of Unique Countertops

.
glass island countertop
Go to the article: 

Worried About Dust from Remodeling?

.
Concrete cutting

Countertop Kitchen Installers in Raymond

Companies below are listed in alphabetical order.

To view top rated service providers along with reviews & ratings, JOIN ANGIE'S LIST NOW!