Gleason Interior Trim Installation

Get quotes from professionals in your area!

Angie's List : Local Reviews : Handymen : WI : Gleason : Gleason Handyman Services : Gleason Interior Trim Installation
A
2
Reviews
Recent Review: Highly recommended!! Great work and got the job in timely manner.. would definitely hire again
A
10
Reviews
Recent Review: Kris has done several jobs for me with great satisfaction. His attention to detail and craftsmanship are impeccable. He is always punctual , asks all the right questions, finds solutions to issues and delivers a fantastic finished product. Everyone will be impressed with his work!
N/A
4
Reviews
Recent Review: Chad was awesome!  He squeezed in my project in between other things he was working on.  He came out on Thursday, looked over my project, went over everything that would be needed to do the project right, gave me an estimate, and was to work the next day.  He came back on Monday to finish the job and had everything done just like he said he would.  He even went over maintenance needs for the future so that I can keep my bathroom in tip top shape.  Chad will be the first person I call for any future home remodeling projects I have.
N/A
1
Review
Recent Review: We provide this information to help others avoid the horrendous experiences we had with Skinner Construction. We hired a professional inspector to inspect the house.  He found 64 code violations. The builder had a total disregard for the manufacturers? guidelines regarding product installation procedures.  The foam insulation board was exposed to the elements well beyond time limitations that were recommended.  Our kitchen countertops were not glued as instructed?instead joints were joined with silicon and hence the entire countertop needed to be replaced.  Our fireplace door was permanently cemented to the opening, which was against installation instructions, causing it to pop loose when expansion occurred when in use.  This needed to be redone.  Hearthstones were not installed according to manufacturers? instructions.   A window needed to be replaced because it warped due to it not being finished in a timely manner.  Not working with materials results in manufacturers? warranties being voided.  When we brought this to the builders? attention, he simply disregarded our concerns.  This is a builder who told us to back off?he knew what he was doing.  Obviously, he did not, and/or simply did not care. We have had to re-do many tasks?especially  applying the appropriate number of finish coats to interior trim and filling thousands of nail holes, which was extremely labor intensive.  Drywall needed more mud on seams and screw heads as they could easily be seen.  Due to the builders? lack of supervision of the electrical work, we had a number of ?mystery? switches?they controlled nothing.  Some of the lighting we wanted was not installed, necessitating the installation after-the-fact, which resulted in holes being cut into the finished drywall to run wires, therefore requiring significant drywall repairs.  This was totally avoidable if our plans were followed from the beginning.  Again, more issues caused by the actions of someone who refused to build this house in the manner in which we wanted?he knew best?NOT! We tried to work with Mark Skinner to correct the defective workmanship but the right-to-cure letters we sent to Mark were totally ignored.  We will need to spend thousands of dollars to correct his blunders and short cuts in order for us to get this house built to the original specifications.

Reviews in Gleason to Install Interior Trim

AKC Home Improvement LLC
Kris has done several jobs for me with great satisfaction. His attention to detail and craftsmanship are impeccable. He is always punctual , asks all the right questions, finds solutions to issues and delivers a fantastic finished product. Everyone will be impressed with his work!
- Andrew W....
A2 Tru Carpenters LLC
Chad was awesome!  He squeezed in my project in between other things he was working on.  He came out on Thursday, looked over my project, went over everything that would be needed to do the project right, gave me an estimate, and was to work the next day.  He came back on Monday to finish the job and had everything done just like he said he would.  He even went over maintenance needs for the future so that I can keep my bathroom in tip top shape.  Chad will be the first person I call for any future home remodeling projects I have.
- Crystal H....
FSKINNER CONSTRUCTION
We provide this information to help others avoid the horrendous experiences we had with Skinner Construction. We hired a professional inspector to inspect the house.  He found 64 code violations. The builder had a total disregard for the manufacturers? guidelines regarding product installation procedures.  The foam insulation board was exposed to the elements well beyond time limitations that were recommended.  Our kitchen countertops were not glued as instructed?instead joints were joined with silicon and hence the entire countertop needed to be replaced.  Our fireplace door was permanently cemented to the opening, which was against installation instructions, causing it to pop loose when expansion occurred when in use.  This needed to be redone.  Hearthstones were not installed according to manufacturers? instructions.   A window needed to be replaced because it warped due to it not being finished in a timely manner.  Not working with materials results in manufacturers? warranties being voided.  When we brought this to the builders? attention, he simply disregarded our concerns.  This is a builder who told us to back off?he knew what he was doing.  Obviously, he did not, and/or simply did not care. We have had to re-do many tasks?especially  applying the appropriate number of finish coats to interior trim and filling thousands of nail holes, which was extremely labor intensive.  Drywall needed more mud on seams and screw heads as they could easily be seen.  Due to the builders? lack of supervision of the electrical work, we had a number of ?mystery? switches?they controlled nothing.  Some of the lighting we wanted was not installed, necessitating the installation after-the-fact, which resulted in holes being cut into the finished drywall to run wires, therefore requiring significant drywall repairs.  This was totally avoidable if our plans were followed from the beginning.  Again, more issues caused by the actions of someone who refused to build this house in the manner in which we wanted?he knew best?NOT! We tried to work with Mark Skinner to correct the defective workmanship but the right-to-cure letters we sent to Mark were totally ignored.  We will need to spend thousands of dollars to correct his blunders and short cuts in order for us to get this house built to the original specifications.
- Phill C....