Copley Asphalt Paving Companies

Get quotes from professionals in your area!

A
3
Reviews
Recent Review: Solomon made the repairs necessary to my driveway and I had some concerns about some of the patches. He came back and repaired the areas of concern and decided to add more to the job, which I wasn't happy with at the time, but it looks great. I'm hoping that I won't have problems with my snowplowing this winter.
A
1
Review
Business Description: Akron Asphalt Company provides asphalt paving, milling, sealcoating, concrete and drainage solutions for the past 8 years. With the combination of updated equipment, experienced labor and quality material, we provide professional paving and sealcoating at competitive prices.
A
5
Reviews
Recent Review: GAR/Doug did an excellent job. We had a hard time deciding on the new design and Doug gave better recommendations than a professional (and expensive) designer. Doug and his crew were professional, did high quality work, and completed our big job in 2-3 days. Doug also used a unique limestone that hardens like concrete but at half the cost. Our neighbors and landscaper were very complimentary on our new driveway. Cheers to GAR!
B
32
Reviews
Recent Review: They did a great job, they were on time. We love our new driveway.
N/A
1
Review
Recent Review: I am contemplating working with them. I saw them working down the road and it kind of impressed me. When they came to review the project they were extremely prompt. Looking at their equipment I think they can do the job. Before I use them I am looking for a cap on the amount they quoted. The owner is a sensible person.
N/A
17
Reviews
Recent Review: We received and estimate at the same time as our neighbor across the street. This company gave both of us a discount to do our respective driveways due to the proximity of the jobs. That was a nice bonus! The driveway looks great and was completed right on time. They even hauled away all of the excess debris from the driveway that existed many years before we bought this house.
N/A
12
Reviews
Recent Review: Company was quick to respond for an estimate and was very prompt in doing the work when the job was accepted. Did an excellent job.
N/A
16
Reviews
Recent Review: I WOULD HAVE APPRECIATED IF THEY WOULD CALL FIRST BEFORE COMING TO DO THE WORK, FOR OBVIOUS REASONS.

Reviews in Copley for Asphalt Paving

FDiscount Quality Paving Co
Bottom line on this driveway replacement by Discount Quality paving is that it  took about 7 weeks for this driveway to get done, it looks terrible,  and it cost me $6000. His workers obviously don't know what they're doing and neither does Derrik.  I hired him because of the good reviews on Angies List but he was one of the worst, most irresponsible contractors I have ever dealt with. I wish I had never hired him. The nitty gritty: I hired Derrik from Discount Quality paving to completely tear out and replace my asphalt driveway. He asked for half of the payment up front and at the last minute he wanted part of it in cash. I paid him and he started the work on time (with delays for weather). We discussed multiple times that the driveway grade had to be below the basement window wells to keep water from flowing toward the house. He agreed and assured me that this would be the case. When the driveway was torn out and the base was in I questioned whether it was low enough, he assured me it was. When the asphalt was put in the next day his crew had put asphalt over the window well bases and up against the house. I've never seen anyone do this.It was put in above grade.  I asked him to fix the problem and he agreed to cut that portion of the driveway out and replace it properly. When he did this the driveway was sunken so that water pooled at the house .And it did not pass city inspection  I asked him to fix it again, so he tore out the lower half of driveway :this was inspected again and still did not pass inspection. So I asked him to regrade the lower half of driveway again. He did not answer multiple phone calls.Quite a bit of time went by.  And I started to think that he had decided to bail out on the project. I asked 3 other driveway contractors to look at the driveway and see if they could repair it, they were appalled by the incredibly poor job that was done. One contractor commented that it looked like he did'nt know what he was doing. Then I got a call when I was at work that he had poured asphalt on the lower driveway and wanted to be paid. I was pretty upset.  By the end of this disasterous project, people were suggesting that I have the police remove him from my property. Do not hire this contactor, you will be very sorry.
- Maia D....
DTITAN ASPHALT & PAVING
Came out for estimate within 10 days. Received estimate in US Mail over 10 days later, along with follow-up phone call same day. Price was as high as concrete drive, which I already initiated work on. Another follow up call 2 weeks later after my concrete drive was finished. Very polite in person and on phone, but slow in response and price was high.
- Thomas...
DLIPTON CONCRETE
Poorly. Seller provided Lipton's bid for concrete driveway. After starting work, the required permit was not obtained until Lipton was questioned. Lipton had removed the old concrete, but the permit was to "replace asphalt driveway with asphalt." Large area of asphalt was paved under two inches thick.
- James B....
FNorth Coast Roofing and Asphalt Paving
We are a small church located in Grafton, OH. On October 25, 2017 we entered into a contract with Vincent Miller, owner of North Coast Roofing and Construction to repave the entire Church parking lot. The Contract required a deposit of $9000, and was paid to Mr. Miller on October 25, 2017. They were to begin work in late October 2017. We were asked to delay the job until the Spring of 2018 because North Coast Roofing and Construction felt the weather at that time of year is not conducive for repaving. We were promised that we would be first on their “job schedule” for the Spring of 2018. We made numerous attempts to contact them in May, June and July 2018. After numerous calls Mr. Miller finally agreed to meet with me at the parking lot location on July 12th. At that time he asked that Church to pay an extra $9,000 or he wouldn't do the work. I requested that he honor his contract for the amount stated. Since he refused to honor the contract for the amount stated in the contract. I requested the $9,000 deposit to be returned. The Contract does not state that the deposit is non-refundable and yet Mr. Miller refused to return the down payment. We have taken North Coast Roofing and Construction to litigation in Parma Municipal Court and won a default judgment on April 2nd, 2019. They refused to respond to a court summons and complaint. This is public record. I caution anyone from doing business this this company or the owner. If an individual or organization would do this to a small church, they are capable of swindling anyone.
- Greg T....
BAbby Construction Company
THE QUALITY OF THE WORK WAS VERY GOOD. THE ONLY COMPLAINT I HAVE IS THE TIMELINESS OF GETTING EVERYTHING DONE. FROM START TO FINISH IT TOOK ABOUT 6 WEEKS (WITH 2 WEEKS BETWEEN THE GARAGE BEING FINISHED AND THE DRIVEWAY GETTING STARTED) AND IT SEEMED TO US THAT THE WORKERS WOULD ONLY WORK ABOUT HALF THE DAY. IF THEY HAD PUT IN A FULL DAY, THINGS COULD HAVE BEEN DONE IN HALF THE TIME. THIS WAS ESPECIALLY INCONVENIENT BECAUSE WE HAVE TENANTS WHO LIVE IN AN APARTMENT ABOVE OUR GARAGE AND THEY HAD TO PARK ON THE SIDE STREET FOR ALL OF THAT TIME.
- David G....
FDAGG'S SEALCOATING & ASPHALT PAVING
Contractor came out gave estimate to resurface driveway.  I accepted the bid and told them to let me know when they would be out.  A few weeks went by and I never heard from them.  I came home one night and they work had been done without any notification.  The new asphalt was not pitched right and rainwater now runs away from the driveway drain and  towards my house which is causing leaking through the foundation.  I called and explained what happened and the owner came out to evaluate the work.  He told me that it was not done right and that they would fix it in a few weeks and that they would come out and sealcoat the drive in the spring to make up for the error.  A few weeks went by with nothing from the company so I called and talked to the owner who told me that the weather was to cold to pour asphalt now but then would fix it it in the spring when they were working in the parking lot at the top of the street.  Spring came and the parking lot was ground down and resurfaced, but my driveway was not fixed and my calls were not returned.  Over the next few years I continued to call to have repairs made and have never received a return phone call.  I called and emailed again a few weeks ago looking to have the repairs made and an additional area of asphalt poured and still have not received any communication from Dagg's Asphalt.
- Noah C....
APromark Asphalt Paving & Seal Coating
It went very well. I had good communication from their office once the estimate was received. Good follow through. I was actually out of town when they did the work but they called to advise me of their start time/day. My neighbors have commented on what a good job they did.
- Jacqueline M....
APROTECTOSEAL ASPHALT MNTNC
RESURFACED PART OF ASPHALT DRIVEWAY-REMOVED FROM A WATERPROOFING JOB. RESPONSIVE TO ALL QUESTIONS. INSTALLATION CREW WAS PROMPT, POLITE, AND TIDY.
- Judith F....
AHolland Paving
THIS WAS FOR OUR DRIVE AND AN AJOINING NEIGHBORS. THEY WERE TIMELY, THEY WERE EXPERTS, THEY DIDN'T MISS A TRICK. THEY WERE ON TOP OF EVERYTHING.
- Lesley L....
AGranger Asphalt & Concrete Paving
It went very well. The 2 workers arrived as expected, and did an excellent and neat job. They notified me they had arrived and advised not to use driveway for 24 hours. They taped off the entrance to the driveway when finished.
- Ann B....