Bouckville Grout Repair

Get quotes from professionals in your area!

A
7
Reviews
Recent Review: Bathroom was already demolished down to the studs before contractor was hired. Mike closed up an existing doorway into an adjacent bathroom at our request and installed new sheetrock on walls and ceiling. He ran electrical for a new outlet (the bathroom previously had no power outlets), installed new ceiling light and fan (and installed vent to outside which the bathroom previously did not have) and installed lighting over the sink. Adjusted plumbing to accommodate a standard shower instead of a tub/shower combo (tub already been pulled out), installed shower pan and built custom bench for the shower, tiled shower as well as floor outside shower, installed toilet, new sink/vanity, and medicine cabinet built into the wall above the sink. Painted the walls, cut and installed wood baseboard, reinstalled the main door to the bathroom which had been removed during demolition. Mike did all of the work we asked for and was very accommodating . The work took a bit longer than originally projected due to an unexpected medical-related delay that the contractor could not have foreseen or prevented. As far as we are concerned, the quality of the work more than made up for any delays. Aside from the work on the bathroom, Mike was also very helpful in recommending other specialist contractors for other renovation projects that we were considering.

Reviews in Bouckville to Replace or Repair Grout

AMoran Construction
Bathroom was already demolished down to the studs before contractor was hired. Mike closed up an existing doorway into an adjacent bathroom at our request and installed new sheetrock on walls and ceiling. He ran electrical for a new outlet (the bathroom previously had no power outlets), installed new ceiling light and fan (and installed vent to outside which the bathroom previously did not have) and installed lighting over the sink. Adjusted plumbing to accommodate a standard shower instead of a tub/shower combo (tub already been pulled out), installed shower pan and built custom bench for the shower, tiled shower as well as floor outside shower, installed toilet, new sink/vanity, and medicine cabinet built into the wall above the sink. Painted the walls, cut and installed wood baseboard, reinstalled the main door to the bathroom which had been removed during demolition. Mike did all of the work we asked for and was very accommodating . The work took a bit longer than originally projected due to an unexpected medical-related delay that the contractor could not have foreseen or prevented. As far as we are concerned, the quality of the work more than made up for any delays. Aside from the work on the bathroom, Mike was also very helpful in recommending other specialist contractors for other renovation projects that we were considering.
- Jolene S....