Huntsville Master Bedroom Remodel

Get quotes from professionals in your area!

A
9
Reviews
Recent Review: Very good.  They started when they said and finished in 4 weeks like they said and did an excellent job.
N/A
22
Reviews
Recent Review: I was impressed with the professionalism. They always maintained good communication and worked in a timely manner. I'm not one to offer praise easily but I was very happy with their work and price. They stayed within budget and we talked over a few minor additions I wanted during the project. I did not feel pressured to purchase more items. I would definitely use them again.
D
5
Reviews
Recent Review: We had the following issues: 1. Subcontractor clipped waterline during excavation which resulted in elements in our water heater burning up-needed to purchase a new water heater. 2. Concrete Sub contractor couldn't read the blueprint which resulted in a 34 inch door being put in versus the 36 inch door we requested. 3. Carpenter sub contractors didn't have materials to do their work. ie ladders, 1 nailer for 6 workmen. 4. Subcontractors would only work 4-5 hours per day and we paid for 8 hours of work. 5. Sub contractor Foreman did not know how to read blueprint. 6. Materials were never delivered in proper order, quantity and specifications. 7. When General contractor didn't pay sub contractor, sub-contractor threatened owner-physically and threatened putting a lien on our property. Police were notified! 8. Wasted material due to errors which we paid for. 9.General contractor personnel had to be instructed by owner on how to put in insulation and eave baffles. 10. Put in 1/2 inch drywall and had to be replaced because it needed to be 5/8 inch-fire rated drywall. Owner had to pay crew for removal and replacement. 11. HVAC sub contractor would not correct his mistakes on how he put in HVAC. 12. Engineering miscalculation in electrical installation. Did not follow blueprint for necessary electricity to be placed in the addition. 13. Dry wall finishing was not completed-only 2 coats applied, did not sand and painted over second coat. 14. Painting is substandard-ceiling was to be sand coated finish and swirls not completed. Ceiling paint chips are falling daily-in living room, dining room and master bedroom. 15. Completion of garage not done-drywall finishing/paint. 16. Mudding of second coats of drywall is rough, wavy. Walls not repaired-when walk thru done, blue tape placed in areas that needing fixing and they were removed by contractor and work was not done. 17. Grouting of ceramic floor was hit or miss. 18. French doors-double glazed have fingerprints on the inside of the windows. Contractor stated he would get them replaced and it was not done. 19. Window casements did not have J channel installed. The windows casements are crooked and 1/4 to 1/2 difference from top to bottom. 20. Deck not completed-Bannisters loose/wobbly with broken or missing filaments.

Reviews in Huntsville to Remodel Master Bedroom

ALAURIE KITCHEN & BATH CTR
Very good.  They started when they said and finished in 4 weeks like they said and did an excellent job.
- Doug H....
ANorth Star Homes & Development LLC
I was impressed with the professionalism. They always maintained good communication and worked in a timely manner. I'm not one to offer praise easily but I was very happy with their work and price. They stayed within budget and we talked over a few minor additions I wanted during the project. I did not feel pressured to purchase more items. I would definitely use them again.
- Dawn L....
DHooten Homes LLC
We had the following issues: 1. Subcontractor clipped waterline during excavation which resulted in elements in our water heater burning up-needed to purchase a new water heater. 2. Concrete Sub contractor couldn't read the blueprint which resulted in a 34 inch door being put in versus the 36 inch door we requested. 3. Carpenter sub contractors didn't have materials to do their work. ie ladders, 1 nailer for 6 workmen. 4. Subcontractors would only work 4-5 hours per day and we paid for 8 hours of work. 5. Sub contractor Foreman did not know how to read blueprint. 6. Materials were never delivered in proper order, quantity and specifications. 7. When General contractor didn't pay sub contractor, sub-contractor threatened owner-physically and threatened putting a lien on our property. Police were notified! 8. Wasted material due to errors which we paid for. 9.General contractor personnel had to be instructed by owner on how to put in insulation and eave baffles. 10. Put in 1/2 inch drywall and had to be replaced because it needed to be 5/8 inch-fire rated drywall. Owner had to pay crew for removal and replacement. 11. HVAC sub contractor would not correct his mistakes on how he put in HVAC. 12. Engineering miscalculation in electrical installation. Did not follow blueprint for necessary electricity to be placed in the addition. 13. Dry wall finishing was not completed-only 2 coats applied, did not sand and painted over second coat. 14. Painting is substandard-ceiling was to be sand coated finish and swirls not completed. Ceiling paint chips are falling daily-in living room, dining room and master bedroom. 15. Completion of garage not done-drywall finishing/paint. 16. Mudding of second coats of drywall is rough, wavy. Walls not repaired-when walk thru done, blue tape placed in areas that needing fixing and they were removed by contractor and work was not done. 17. Grouting of ceramic floor was hit or miss. 18. French doors-double glazed have fingerprints on the inside of the windows. Contractor stated he would get them replaced and it was not done. 19. Window casements did not have J channel installed. The windows casements are crooked and 1/4 to 1/2 difference from top to bottom. 20. Deck not completed-Bannisters loose/wobbly with broken or missing filaments.
- Cindy C....