Fort Dodge Bathroom Remodeling

Get quotes from professionals in your area!

N/A
2
Reviews
Recent Review: I had ordered all cabinets, flooring, shower stall, shower doors, shower seat, faucets, grab bars, toilet, and etc, before we hired labor to do the project. Joe was in between jobs and available to start on the job within a few days. He has a full time job also , but was able to get most of the work done when he had some time off his swing shift schedule. He came whenever he could after that. When he needed to unhook the toilet, he always hooked it back up at the end of the day. (I used a portable toilet while it was unhooked.) We only have one bathroom. We were without a shower only a couple days. I feel he was very sensitive to our needs. He did a very good job. He had a friend do the spraying plaster on the wall board and we hired a"plumber" for the shower, otherwise he was able to do all the work himself. I am very pleased with the outcome. It is so muchmore helpful to me. I have difficulty getting around and have a balance disorder.
A
40
Reviews
Recent Review: Tim gave us an estimate for replacing the 45 year old materials in our condo. He was very professional and exceptionally knowledgeable. He said that since he is a tile man and we wanted to go with sheet vinyl that he would bring in contractors with whom he regularly works to do the various projects. One gentleman would remove the existing vanity and flooring and put down new luan and install the vanity, another would take care of the plumbing and one more would do the sheet vinyl. Everything was in place and his estimate was competitive. We simply decided to go with a different contractor. In talking with him it is clear that he is incredibly well-versed in contracting and I would definitely call him again before I get other work done in my home.
N/A
5
Reviews
Recent Review: I know I can trust him because of previous work, so I was comfortable to have him here when I was of the country. His tool were in the way during the job. This is understandable because we don't have a garage. He encountered a couple of things in the job which he had not bid, and he did some at no extra cost and others at a very reasonable rate. His work is quick, but not so quick as to be at the expense of quality. He had some problems getting the adhesive on the shower floor to dry after he tiled it, and delayed 3 days in the schedule drying it. Although it put him behind with other jobs he was doing, he was very diligent to make sure it was bone dry before he proceeded to the wall tile. I was a little unconventional with the shower, as I wanted it to be part of my man cave ultimately. I put in three heads - conventional, wand and rain, and he worked around the copper plumbing to get it exactly like I wanted it. He had not worked with a multi-head diverter before, but he installed it flawlessly. If I had been there, I would have had him hang the medicine cabinet differently, but I was able to easily remedy the situation by moving it with my son. I had delays in getting the door (special size special order) and the medicine cabinet (not stocked), so he had to come back to do them each separately, while he was in the midst of another job. The door came in first, and he came promptly at a covenient time to install it. Then the cabinet came, and he arrived the nest day to install it. I had also told him that the door didn't close right because the hinge side needed a little work, and he fixed that at the same time.
N/A
1
Review
Recent Review: Initially took a few phone calls to get them to house to quote job. After looking at home it took about 2 days to get official quote. After comitting to the estimate, they did start to perform work right away. Took about 3 days to finish which was acceptable due to grout having to set, etc. After shower base was set, it was noted that there was a "bounce" in the base. As he put it, "Some give." Homeowner voiced concern. Advised by Kent that this is normal. Well......8 months later there is a crack in my shower base from where my 42 pound son stepped in. It had been getting "squishier" since original install date, almost as if the mortor bases set under the shower were not set right. Kent was called....about 5 times over 1.5 weeks before a phone call was eventually returned. He was advised of problem and said he would check it out. He showed up the next day and looked at base. He tried saying he thought something was wrong with the floor and thats why it "gave out" and cracked. (The floor had completely new 3/4" subfloor laid during remodel.) After discussion he sid he would have to go to local supplier to make sure he can still get the same matching tile since he would have to remove the bottom row to remove the base. Agreed, and he said he would be in contact. That was 1 month, and 3 phone calls ago. Pretty sure he isn't coming back to fix the job.

Review for Fort Dodge Bathroom Remodeling

AJoe Montgomery
I had ordered all cabinets, flooring, shower stall, shower doors, shower seat, faucets, grab bars, toilet, and etc, before we hired labor to do the project. Joe was in between jobs and available to start on the job within a few days. He has a full time job also , but was able to get most of the work done when he had some time off his swing shift schedule. He came whenever he could after that. When he needed to unhook the toilet, he always hooked it back up at the end of the day. (I used a portable toilet while it was unhooked.) We only have one bathroom. We were without a shower only a couple days. I feel he was very sensitive to our needs. He did a very good job. He had a friend do the spraying plaster on the wall board and we hired a"plumber" for the shower, otherwise he was able to do all the work himself. I am very pleased with the outcome. It is so muchmore helpful to me. I have difficulty getting around and have a balance disorder.
- Patricia A....
ATILE TIM Contracting
Tim gave us an estimate for replacing the 45 year old materials in our condo. He was very professional and exceptionally knowledgeable. He said that since he is a tile man and we wanted to go with sheet vinyl that he would bring in contractors with whom he regularly works to do the various projects. One gentleman would remove the existing vanity and flooring and put down new luan and install the vanity, another would take care of the plumbing and one more would do the sheet vinyl. Everything was in place and his estimate was competitive. We simply decided to go with a different contractor. In talking with him it is clear that he is incredibly well-versed in contracting and I would definitely call him again before I get other work done in my home.
- Alex B....
AGreg Steuk
I know I can trust him because of previous work, so I was comfortable to have him here when I was of the country. His tool were in the way during the job. This is understandable because we don't have a garage. He encountered a couple of things in the job which he had not bid, and he did some at no extra cost and others at a very reasonable rate. His work is quick, but not so quick as to be at the expense of quality. He had some problems getting the adhesive on the shower floor to dry after he tiled it, and delayed 3 days in the schedule drying it. Although it put him behind with other jobs he was doing, he was very diligent to make sure it was bone dry before he proceeded to the wall tile. I was a little unconventional with the shower, as I wanted it to be part of my man cave ultimately. I put in three heads - conventional, wand and rain, and he worked around the copper plumbing to get it exactly like I wanted it. He had not worked with a multi-head diverter before, but he installed it flawlessly. If I had been there, I would have had him hang the medicine cabinet differently, but I was able to easily remedy the situation by moving it with my son. I had delays in getting the door (special size special order) and the medicine cabinet (not stocked), so he had to come back to do them each separately, while he was in the midst of another job. The door came in first, and he came promptly at a covenient time to install it. Then the cabinet came, and he arrived the nest day to install it. I had also told him that the door didn't close right because the hinge side needed a little work, and he fixed that at the same time.
- Ronnie V....
DKRISTENSEN & SONS
Initially took a few phone calls to get them to house to quote job. After looking at home it took about 2 days to get official quote. After comitting to the estimate, they did start to perform work right away. Took about 3 days to finish which was acceptable due to grout having to set, etc. After shower base was set, it was noted that there was a "bounce" in the base. As he put it, "Some give." Homeowner voiced concern. Advised by Kent that this is normal. Well......8 months later there is a crack in my shower base from where my 42 pound son stepped in. It had been getting "squishier" since original install date, almost as if the mortor bases set under the shower were not set right. Kent was called....about 5 times over 1.5 weeks before a phone call was eventually returned. He was advised of problem and said he would check it out. He showed up the next day and looked at base. He tried saying he thought something was wrong with the floor and thats why it "gave out" and cracked. (The floor had completely new 3/4" subfloor laid during remodel.) After discussion he sid he would have to go to local supplier to make sure he can still get the same matching tile since he would have to remove the bottom row to remove the base. Agreed, and he said he would be in contact. That was 1 month, and 3 phone calls ago. Pretty sure he isn't coming back to fix the job.
- David H....