De Leon Springs Room Soundproofing

Get quotes from professionals in your area!

N/A
4
Reviews
Recent Review: From start to finish it went well. I was surprised, how fast he got started. There was alot of demolition. First the ceiling and a/c ducts were removed, then the walls. The electrical was interesting but he got it done, since it was a remodel, you are not sure of what you will find and there were mistakes and stuff from the contractors that needed to be dealt with, before we could move on. Plumbing and rerouting water supplies to upstairs, changed our plans a little bit, but he was very helpful in working things, as closely as possible to our original plans. Things went well and we are very please with our kitchen. It took us 3 months start to finish, with waiting on cabinet and counter problems. Not caused by Allsite.

Reviews in De Leon Springs to Room Soundproofing

FALFRED BRIAND PLUMBING
The job was to have taken a week. It took him 2 months. He gave a set price then claimed overcharges. The work was shoddy, gaps in wall, didn't follow directions (which cost us more money), lied about who said what. Overcharges for concrete pad when he said it would cost a couple of hundred for a 4x4 he charged $500! He failed to put a drainage pipe beneath the concrete prior to pouring. He installed rails incorrectly and didn't complete the job then charged more to complete it yet he had given a set price. Left a gaping hole and exposed plumbing pipes in the drop ceiling. I refused to pay until he completed that. He boxed it in with wood and failed to even sand the wood. He installed a sink and it about rattled off the wall yet he claimed it was sturdy. Ha!
- Maggi H....
BALLSITE HOME IMPROVEMENT LLC
From start to finish it went well. I was surprised, how fast he got started. There was alot of demolition. First the ceiling and a/c ducts were removed, then the walls. The electrical was interesting but he got it done, since it was a remodel, you are not sure of what you will find and there were mistakes and stuff from the contractors that needed to be dealt with, before we could move on. Plumbing and rerouting water supplies to upstairs, changed our plans a little bit, but he was very helpful in working things, as closely as possible to our original plans. Things went well and we are very please with our kitchen. It took us 3 months start to finish, with waiting on cabinet and counter problems. Not caused by Allsite.
- Linda Y....