Thompson Kitchen Remodel

Get quotes from professionals in your area!

A
27
Reviews
Recent Review: This process went very well.  We met initially with Jim to discuss the general process that Scribner's uses.  Jim came out took initial measurements and photos and developed a comprehensive plan with several alternatives.  This plan was revised based on our inputs and trade-offs made in cost/material/scope.  During the process a certified architect came out conducted additional measurements to ensure plans would meet code. Once, we had ordered all of our appliances, lights, etc, Scribner's coordinated with the appliance stores concerning delivery and timing.  And, the start date was scheduled.  We appreciated that Scribner's wouldn't start until parts were on hand. I think the original estimate was about 8 weeks, and the construction was completed early. Workers showed up on time, were very professional, courteous and fast.  In particular, the lead carpenter Ken was outstanding.  Jim also kept in close watch and was able to quickly address any concerns.  The electrician did a fantastic job of installing new lights in the kitchen and installing new LED lights in the adjacent room.  We hired Scribners because we wanted a single point of contact and high quality.  They delivered on both.  We intend on using them to remodel several bathrooms. This project has completely changed our main living area.  It took an outmoded architecture, cabinets and created a spacious area that was a major success over Thanksgiving.
A
36
Reviews
Award 2018Super Service Award
Recent Review: Remodeled bathroom and remodeled kitchen.
A
4
Reviews
Recent Review: John and his crew are excellent workers. Very pleasant people. Always on time and never left a mess. They have high standards and the result reflect their good work. Cyr Painting is The Best!
N/A
4
Reviews
Recent Review: It went great. They were on time each day. They cleaned up after themselves every night before they quit. They completed the job in two weeks which entailed: painting, a new hardwood floor, all new cabinets, new sink and counter top, new refrigerator and new dish washer. Dave Ballestrini was an outstanding foreman, pleasant to talk with, and very flexible with our demands.
N/A
5
Reviews
Recent Review: very professional and understanding of the time constraints of the remodeling business. Willing to discuss various ways of doing the work but never allowing sub-standard or faulty procedures.

Reviews for Kitchen Remodeling in Thompson

ACYR PAINTING AND CONSTRUCTION
John and his crew are excellent workers. Very pleasant people. Always on time and never left a mess. They have high standards and the result reflect their good work. Cyr Painting is The Best!
- Gillian M....
AJ D BUILDERS
It went great. They were on time each day. They cleaned up after themselves every night before they quit. They completed the job in two weeks which entailed: painting, a new hardwood floor, all new cabinets, new sink and counter top, new refrigerator and new dish washer. Dave Ballestrini was an outstanding foreman, pleasant to talk with, and very flexible with our demands.
- Thomas G....
ASCOTT BONDY
very professional and understanding of the time constraints of the remodeling business. Willing to discuss various ways of doing the work but never allowing sub-standard or faulty procedures.
- Elbert S....
AScribners Kitchen & Bath Design
This process went very well.  We met initially with Jim to discuss the general process that Scribner's uses.  Jim came out took initial measurements and photos and developed a comprehensive plan with several alternatives.  This plan was revised based on our inputs and trade-offs made in cost/material/scope.  During the process a certified architect came out conducted additional measurements to ensure plans would meet code. Once, we had ordered all of our appliances, lights, etc, Scribner's coordinated with the appliance stores concerning delivery and timing.  And, the start date was scheduled.  We appreciated that Scribner's wouldn't start until parts were on hand. I think the original estimate was about 8 weeks, and the construction was completed early. Workers showed up on time, were very professional, courteous and fast.  In particular, the lead carpenter Ken was outstanding.  Jim also kept in close watch and was able to quickly address any concerns.  The electrician did a fantastic job of installing new lights in the kitchen and installing new LED lights in the adjacent room.  We hired Scribners because we wanted a single point of contact and high quality.  They delivered on both.  We intend on using them to remodel several bathrooms. This project has completely changed our main living area.  It took an outmoded architecture, cabinets and created a spacious area that was a major success over Thanksgiving.
- Robert H....