Madison Deck Waterproofing

Get quotes from professionals in your area!

N/A
0
Reviews
Business Description: Available upon request
N/A
0
Reviews
Business Description: EJconstruction company erects metal buildings for your shop,warehouse,or factory needs.we do residential remodeling from floors to ceiling.we also can waterproof and stop rust with a sprayable coating witch will make your old roof like new.cost is determined by job
N/A
2
Reviews
Business Description: M.A.G CUSTOM PAINTING & HOME IMPROVEMENT CO Interior,exterior painting & home remodeling. Commercial and residential license. # 755971 bonded and insured FREE ESTIMATES! SERVING SACRAMENTO AND THE SANFRANCISCO BAY AREA COMPLETE PAINTING AND HOME IMPROVEMENT Contractors in Sacramento
N/A
3
Reviews
Recent Review: All went well because Brian made sure I understood what needed done, how it was done, and communicated any changes or surprises along the way.
N/A
13
Reviews
Recent Review: He did an excellent job. He was prompt and professional. I would definitely recommend him.
A
154
Reviews
Award 2018Super Service Award
Business Description: We are a team of skilled trade professionals dedicated to quality workmanship and trusted relationships with our clients. Our subcontractors are all trusted parts of our team. We strive to coexist with your lifestyle's needs and concerns and we have fun doing our work - which is making the dream of your living space come to life! Serving Napa, Marin, Yolo, Contra Costa & Alameda Counties as well as parts of others. Call to verify. Hourly handyman services are not available in all cities and counties.
A
19
Reviews
Award 2018Super Service Award
Recent Review: Hired this contractor and he had them rebuilt in no time, very fair bid, showed up (that is in itself a big bonus) when they were scheduled. Love these guys. No issues with the rebuild and we made it thru a very wet season last year and rebuild looks better aesthetically than initial build.
B
3
Reviews
Recent Review: 1. Upon purchase of a home the under floor area was constructed with a room in jeopardy of the hill slope caving in on it below the first floor. Some floor post supports had already moved out of position, and water had migrated from below the house into the lower room. There also was a severe separation on the retaining wall on the side of the house that caused damage to interior walls and flooring. Work required removal of supports not needed and in the way of construction of retaining wall. A 4 foot wall was required behind two sides of the existing room. Footings, masonry wall, waterproofing, French drain, backfill was required to eliminate the severe hillside slope threatening the lower room area. New floor supports were reinstalled as needed above the wall to establish supports removed during construction. Also other floor supports were reinforced/rebuilt due to earth movement in the area needing grading. Total work was difficult due to limited clearances, and done by hand and skill of knowledge of what needed to be done. Along with the underfloor area one side of the room had a retaining wall, not properly built and separated which let water migrate through a large opening. Dirt was removed, the wall sealed and reinforced with additional concrete. After the underfloor areas were dealt with, the interior portions required removal of ceiling soffits, patching of drywall on walls and ceiling, repair of some HVAC ducting, repair of electrical outlets and installation of new LED recessed lighting and ceiling fan. Eventually they installed new laminated flooring, painted the walls and ceiling. Before moving into the house, the roof also needed replacing. They removed the old shingle roofing, installed new plywood roof sheathing, required felt, all the required flashing/venting, ridge cap venting that integrated with the asphalt shingles chosen. Gutters and downspouts were also installed. 2.  Being very satisfied with their work on the previous project we employed them to help facilitate construction of a 12 foot sliding glass door and associated 12x24 outside deck. The original house only had a 4x8  window located in the living area that faced the open back yard area. The rear of the lot slopes away from the house so the deck takes advantage of the open area by being a couple stories above the yard area. The posts supporting the deck required deeper than usual footing and California Building Codes require probably more than the usual lateral supports than other states. The Deck design required articulated details that called for good craftsmanship and framing knowledge. The hand rail was constructed with usual wood supports, but used tempered glass infill panels to take advantage of the open view. The decking itself was composite material but gave the appearance of wood. Lighting was also installed on each side of the new door opening. Construction required demolition of the existing window, opening of the walls to be 4 feet wider, new door header and supports framed back into the wall. Electrical was needed to be removed, re-routed that continued on to other portions of the house, and switching and lighting for the exterior deck was provided. The Deck required demolition of a portion of a patio roof, and some miscellaneous electrical reconnections. The deck itself needing footings, wall ledgers tied back into the existing floor framing, beams, posts, joists, and better than expected metal bracketing for framing members. All framing came together to provide a very solid and substantial structure. The finishes on the redwood came out very nice, but the most impressive details came to be provided by the views through the glass panels between the deck supports. The Double glass door and glass for the hand railing was provided and installed by a local glass company with coordination of the contractor. We are very please with the construction and end results of this project. future 3. We anticipate that soon we will be remodeling our interior living area which will include a completely new kitchen. We are in the process of choosing finish materials and appliances, and probably will be using Fassett Construction to help facilitate this next project. Of course budget is a main concern and they have always been more than reasonable with the work and materials provided.

Reviews in Madison for Deck Waterproofing

AHow Can I Help? Handyman Srvs/LaCorte Construction
He was great. I called him in the morning and he was here at 12:30 and did the work. He did a great job.
- Doris S....
ABWC CONSTRUCTION INC.
Hired this contractor and he had them rebuilt in no time, very fair bid, showed up (that is in itself a big bonus) when they were scheduled. Love these guys. No issues with the rebuild and we made it thru a very wet season last year and rebuild looks better aesthetically than initial build.
- Rhonda L....
ACustom Home Solutions
All went well because Brian made sure I understood what needed done, how it was done, and communicated any changes or surprises along the way.
- Susan B....
BFassett Construction
1. Upon purchase of a home the under floor area was constructed with a room in jeopardy of the hill slope caving in on it below the first floor. Some floor post supports had already moved out of position, and water had migrated from below the house into the lower room. There also was a severe separation on the retaining wall on the side of the house that caused damage to interior walls and flooring. Work required removal of supports not needed and in the way of construction of retaining wall. A 4 foot wall was required behind two sides of the existing room. Footings, masonry wall, waterproofing, French drain, backfill was required to eliminate the severe hillside slope threatening the lower room area. New floor supports were reinstalled as needed above the wall to establish supports removed during construction. Also other floor supports were reinforced/rebuilt due to earth movement in the area needing grading. Total work was difficult due to limited clearances, and done by hand and skill of knowledge of what needed to be done. Along with the underfloor area one side of the room had a retaining wall, not properly built and separated which let water migrate through a large opening. Dirt was removed, the wall sealed and reinforced with additional concrete. After the underfloor areas were dealt with, the interior portions required removal of ceiling soffits, patching of drywall on walls and ceiling, repair of some HVAC ducting, repair of electrical outlets and installation of new LED recessed lighting and ceiling fan. Eventually they installed new laminated flooring, painted the walls and ceiling. Before moving into the house, the roof also needed replacing. They removed the old shingle roofing, installed new plywood roof sheathing, required felt, all the required flashing/venting, ridge cap venting that integrated with the asphalt shingles chosen. Gutters and downspouts were also installed. 2.  Being very satisfied with their work on the previous project we employed them to help facilitate construction of a 12 foot sliding glass door and associated 12x24 outside deck. The original house only had a 4x8  window located in the living area that faced the open back yard area. The rear of the lot slopes away from the house so the deck takes advantage of the open area by being a couple stories above the yard area. The posts supporting the deck required deeper than usual footing and California Building Codes require probably more than the usual lateral supports than other states. The Deck design required articulated details that called for good craftsmanship and framing knowledge. The hand rail was constructed with usual wood supports, but used tempered glass infill panels to take advantage of the open view. The decking itself was composite material but gave the appearance of wood. Lighting was also installed on each side of the new door opening. Construction required demolition of the existing window, opening of the walls to be 4 feet wider, new door header and supports framed back into the wall. Electrical was needed to be removed, re-routed that continued on to other portions of the house, and switching and lighting for the exterior deck was provided. The Deck required demolition of a portion of a patio roof, and some miscellaneous electrical reconnections. The deck itself needing footings, wall ledgers tied back into the existing floor framing, beams, posts, joists, and better than expected metal bracketing for framing members. All framing came together to provide a very solid and substantial structure. The finishes on the redwood came out very nice, but the most impressive details came to be provided by the views through the glass panels between the deck supports. The Double glass door and glass for the hand railing was provided and installed by a local glass company with coordination of the contractor. We are very please with the construction and end results of this project. future 3. We anticipate that soon we will be remodeling our interior living area which will include a completely new kitchen. We are in the process of choosing finish materials and appliances, and probably will be using Fassett Construction to help facilitate this next project. Of course budget is a main concern and they have always been more than reasonable with the work and materials provided.
- Joseph C....