Biola Shower Door Installation

Get quotes from professionals in your area!

B
8
Reviews
Sears Appliance Repair
Recent Review: Sears not able to perform our job specifications.
N/A
17
Reviews
Central Valley Construction
Recent Review: I am happy with the work. They did everything they said they would but I did have to remind them of a couple things. Would use again.
A
23
Reviews
Chapman Construction Inc
Recent Review: The project went very smoothly.  Vern was professional,  responsive, and offered good suggestions.  He was on top of things and was here often to check on the work.  The workers were proficient,  friendly,  and courteous.  They cleaned up thoroughly at the end of each work day,  and there was minimal disruption to our daily living.  The project finished close to the estimated date,  and we were very pleased with the quality of the work. We gave Chapman Construction a "B" for Price because theirs was not the lowest bid for the job;   we decided to go with them nonetheless because we felt they would be a better fit for us on this particular project.  That had turned out to be a good decision!
N/A
10
Reviews
Your Home Remodeling and Design
Recent Review: Tom and Sandra are a husband and wife team that handle contracting/remodel work and decorating. They worked w/me diligently to arrive at a budget I could live with while providing high quality materials/work. Their subcontracting teams were very professional and did exceptional work---and all were fantastic and fun to work with! Tom outlined everything, including the cost up front, and explained things as they went along whenever i had questions; if something was too costly for me, he would provide viable options or actually work w/his distributor or contact to lower the cost, project took about 2 months. Sandra worked w/me on coordinating colors/materials for flooring, paint, tile, and window treatments. Her suggestions for furniture and other decor was great, never felt pressured, but they did offer their services for purchasing items, which I did on some of the furniture. As described above it was an update/remodel of master bedroom and bath. Installed pocket door between bedroom/bath, replaced 2 windows (enlarged 1), installed new wood flooring, partially removed old "plant ledge", added closet organizers, painted bedroom/bath/closetrooms, added canned lighting in bedroom, bath, and closet, removed old shower and installed new tiled floor to ceiling shower w/new fixtures and shower doors, new tiled bathroom floor, custom vanity w/new sink and granite counter top and new front/doors for linen closet, and installed new doors in remodel area. New furniture, rug, and window treatments were at additional cost. I felt extremely comfortable w/both Tom and Sandra and would definitely recommend their business to others.

Reviews in Biola to Install Shower Door

BCentral Valley Construction
I am happy with the work. They did everything they said they would but I did have to remind them of a couple things. Would use again.
- Chaylon H....
AChapman Construction Inc
The project went very smoothly.  Vern was professional,  responsive, and offered good suggestions.  He was on top of things and was here often to check on the work.  The workers were proficient,  friendly,  and courteous.  They cleaned up thoroughly at the end of each work day,  and there was minimal disruption to our daily living.  The project finished close to the estimated date,  and we were very pleased with the quality of the work. We gave Chapman Construction a "B" for Price because theirs was not the lowest bid for the job;   we decided to go with them nonetheless because we felt they would be a better fit for us on this particular project.  That had turned out to be a good decision!
- Cathy C....
AChapman Construction Inc
Last Fall we began updating a few rooms in our 27 year old home. In the bedrooms, wallpaper was stripped, and walls were textured & painted. One powder bathroom was completely gutted. A second bathroom required a change in all things except cabinetry.  New flooring, lighting, sinks, toilets, faucets and hardware were installed. Extensive marble tile work was done around the tub/shower and on several countertops. Special beveled mirrors and a custom glass shower door were also installed.The end results were beautiful!      We were extremely satisfied with Chapman Construction! The owner, Vern Chapman, is a true professional. He is honest, very particular, and always aims to make the client pleased. He coordinates top-notch subs and is on the job to make sure all work is done perfectly. Every worker that came to the house was prompt, courteous, and left the site clean each day. Our entire project was completed very close to the estimated finish date. One unforeseen glitch and a couple changes made by us, broadened the scope of the job -which required a little extra time for completion.  Again, we enjoyed working with Chapman Construction. They will be the company we call when we need any other remodel work done! We were thrilled with the results and we would wholeheartedly recommend them to everyone!
- Therese S....
AYour Home Remodeling and Design
Tom and Sandra are a husband and wife team that handle contracting/remodel work and decorating. They worked w/me diligently to arrive at a budget I could live with while providing high quality materials/work. Their subcontracting teams were very professional and did exceptional work---and all were fantastic and fun to work with! Tom outlined everything, including the cost up front, and explained things as they went along whenever i had questions; if something was too costly for me, he would provide viable options or actually work w/his distributor or contact to lower the cost, project took about 2 months. Sandra worked w/me on coordinating colors/materials for flooring, paint, tile, and window treatments. Her suggestions for furniture and other decor was great, never felt pressured, but they did offer their services for purchasing items, which I did on some of the furniture. As described above it was an update/remodel of master bedroom and bath. Installed pocket door between bedroom/bath, replaced 2 windows (enlarged 1), installed new wood flooring, partially removed old "plant ledge", added closet organizers, painted bedroom/bath/closetrooms, added canned lighting in bedroom, bath, and closet, removed old shower and installed new tiled floor to ceiling shower w/new fixtures and shower doors, new tiled bathroom floor, custom vanity w/new sink and granite counter top and new front/doors for linen closet, and installed new doors in remodel area. New furniture, rug, and window treatments were at additional cost. I felt extremely comfortable w/both Tom and Sandra and would definitely recommend their business to others.
- Rosalind A....
AChapman Construction Inc
This was the second project Chapman Construction did on our house. (The first was a bathroom remodel in 2015.) Vern Chapman is knowledgeable and professional. He was on site almost everyday to touch base and to do quality control. All the sub-contractors were proficient and courteous, and cleaned up after every work day. The Chapman team of Ryan and Johnny was particularly meticulous, thorough, and accommodating. It did take a while for Vern to prepare the proposal and estimate, but that was because they were busy, which in turn was a reflection of the fine quality of their work. (Personally, I would be wary of hiring a general contractor who has plentiful time on his hands!) And then once work commenced, there was someone working in our house every day, and things progressed quite swiftly. The project did take longer than planned, largely because of a couple of change orders that we had initiated. In all fairness, I should not give a grade on "Price" above, as we did not get a second bid and therefore do not have any other price to compare to. However, I had done research on my own ahead of time, and Vern's price for this project, albeit higher than the "ballpark price" in my mind, was not way out- of-line. Of the three basic elements of a house remodel - price, process, and end-product; the last is the one that is most important to us, ( as that is what we have to live with for years to come.) And in this case, the end-product is superb, and we are quite happy!
- Cathy C....