West Blocton Crown Molding Installaion

Get quotes from professionals in your area!

N/A
6
Reviews
Quality Remodeling
Recent Review: Responded promptly to my phone call, arrived when they said they would. Completed the job in less than 4hours. Caulked the molding and had it ready for paint. Cleaned up extra wood when finished.
A
2
Reviews
Roberts Remodeling LLC
Recent Review: Tommy Roberts and his employees did a great job.
N/A
4
Reviews
Source 1 Construction
Recent Review: Claimed that he installed my air conditioning but he never did. the floors that he put down in kitchen is breaking down and rolling up. He didn't even know what shoe molding or crown molding was. Lied on everything. He didn't do anything that he promised he would do.
A
21
Reviews
Peffer Construction
Award 2018Super Service Award
Recent Review: We knew the moment we met Mr. Peffer for the first time that we had found the right person for our project. You don't find craftsmen like Mr. Peffer anymore. He is a one of a kind expert craftsman and his attention to detail is second to none. If you have specific customization expectations for you project he listens and provides a realistic plan for how to complete the project and exceed your expectations. We now have an AMAZING bathroom with all the bells and whistles!!! We also liked all of his Sub-Contractors. He knows who to call on to get things done and he holds them accountable for their work. Of particular importance to me and my daughter (we are both allergic), neither he nor his Electrician smoke. We have someone that we can trust that we can call on to help us and that is very comforting to know!!! Our project included: oversized soaker tub; ceiling mounted rain head; oversized custom tiled niche; custom tiled tub skirt; blue tooth speaker/exhaust fan; mosaic tile wall backsplash; wall mounted faucets x2; elictrical outlets with USB; knee kick with quad electrical plug ; soft closure cabinet hinges; in closet lighting; closet shelving; towel warmer; GFI outlets; multi-switch lighting control & dimmer; extra wide crown molding throughout bathroom; chandelier installation with extra bracing to handle the weight; leveling of the walls(furring them out); moving plumbing for both the tub and toilet and widening and replacing the entry door to the bathroom. (The project also included completely redoing the hallway, crown molding and replacing the attic stairs, as we had an AC leak in the attic the week before our bathroom project started. Mr. Peffer fixed it all better than it was before.)

Reviews in West Blocton to Install Crown Molding

AQuality Remodeling
Responded promptly to my phone call, arrived when they said they would. Completed the job in less than 4hours. Caulked the molding and had it ready for paint. Cleaned up extra wood when finished.
- Steven S....
FSource 1 Construction
Claimed that he installed my air conditioning but he never did. the floors that he put down in kitchen is breaking down and rolling up. He didn't even know what shoe molding or crown molding was. Lied on everything. He didn't do anything that he promised he would do.
- Judy H....
APeffer Construction
We knew the moment we met Mr. Peffer for the first time that we had found the right person for our project. You don't find craftsmen like Mr. Peffer anymore. He is a one of a kind expert craftsman and his attention to detail is second to none. If you have specific customization expectations for you project he listens and provides a realistic plan for how to complete the project and exceed your expectations. We now have an AMAZING bathroom with all the bells and whistles!!! We also liked all of his Sub-Contractors. He knows who to call on to get things done and he holds them accountable for their work. Of particular importance to me and my daughter (we are both allergic), neither he nor his Electrician smoke. We have someone that we can trust that we can call on to help us and that is very comforting to know!!! Our project included: oversized soaker tub; ceiling mounted rain head; oversized custom tiled niche; custom tiled tub skirt; blue tooth speaker/exhaust fan; mosaic tile wall backsplash; wall mounted faucets x2; elictrical outlets with USB; knee kick with quad electrical plug ; soft closure cabinet hinges; in closet lighting; closet shelving; towel warmer; GFI outlets; multi-switch lighting control & dimmer; extra wide crown molding throughout bathroom; chandelier installation with extra bracing to handle the weight; leveling of the walls(furring them out); moving plumbing for both the tub and toilet and widening and replacing the entry door to the bathroom. (The project also included completely redoing the hallway, crown molding and replacing the attic stairs, as we had an AC leak in the attic the week before our bathroom project started. Mr. Peffer fixed it all better than it was before.)
- Gina N....