Sycamore Baseboard Installation

Get quotes from professionals in your area!

Angie's List : Local Reviews : Handymen : AL : Sycamore : Sycamore Handyman Services : Sycamore Baseboard Installation
N/A
0
Reviews
Business Description: Billing will be done in 3 installments 20% at the beginning of job, 40% at the midway of job completion and the remaining 40% at the completion of the job with your satisfaction of work performed on Siding Installation
N/A
1
Review
Recent Review: He and his workers did an excellent job and the price was very reasonable. I'd recommend this company for any home repairs.
A
6
Reviews
Recent Review: GREAT!!!!!!!!  I will be calling them again. They did what they said they would do. Finished when they said they would finish and was very professional. They even helped us find a reputable electrician (and he was great also). We are very happy with our new living room and as I stated we will be calling them again....
N/A
1
Review
Recent Review: It went beautifully.  Blake and his helpers ripped off the old deck and took it to the landfill.  They cleaned up all the debris left by the demolition, even picked up old nails that had fallen on the ground. Installed new decking, a composite material, not wood.  The job looks beautiful.  We had them lay the board at angles, not just straight lines.  Every joint is even and in line, for every board.  The composite decking isn't as thick as the wood decking, which left lines on the posts and balusters.  Blake covered that with small pieces of wood, similar to laying baseboard.  Did a beautiful job there too, all the joints are even and tight. Again, cleaned up all debris and took it away.
B
14
Reviews
Recent Review: House 1 remodel went well. I received a comprehensive estimate, work was carried out in a timely manner, and inadequate repairs were brought to my standards fairly quickly. Repairs made were sheetrock, framing, finishing, painting, porch roof replacement, floor repair, siding repair, flashing installation, and linoleum installation.  After redoing the poor flashing install, siding repair and linoleum install I was satisfied.  House 2 was a simple sheetrock and paint job.  The finishing work was fine.  The painting however was rushed and in need of a second coat and I was left to repaint the area when he could not correct it in a timely manner.  Repair #2 was sheetrock repair, baseboard prime and paint.  All were done correctly.  House 3 was a difficult job which took several months.  During this time, there were very few disagreements on timeframe and scope of work which is good.  He did collect pay for jobs prior to their completion, which caused discord when items remaining were not really worth the time needed to complete them. Items done were: wall addition, laundry framing and sheetrock, finish work, painting, paneling replacement, door repair, door installation, floor repair, bead board installation, shower cement board installation, porch demo, decking and rail installation, and eave replacement.  Items of concern were cement board installation on the shower surround one inch off tub and too close to plumbing, sheetrock on the ceiling improperly installed (the crown molding was not removed and therefore there was a one inch gap between the ceiling and wall that had to be repaired), large gaps on new eaves, and some items were paid for but not completed or had to be redone included paint, touch up, pressure washing under porch, and siding repair. Upon final payment the remaining items were not attended to.  These included, painting the ceiling, painting closets, removing tape from outlet covers and painting under them.  House 4 was doorway arch, paint, ceiling repair, floor poly, flush mount light install, drain repair, dishwasher install, siding repair, window repair.  Here there was so much paint on the floor that it took me an entire day to remove.  After asking him to redo a lumpy mud job he left it to dry and did not return to prime and paint it.  Silicone was used instead of proper plumbing on the drain repair, which he did correct.  Items paid for and not completed were ceiling prime and paint, sheetrock touch up, and window repair and glazing.  Additional expense for ceiling $50.  House 5 was a simple paint job, window repair and deck pressure wash and railing replacement.  He took an extra half day to replace step tread that was fine and paint return vent covers.  There was so much paint on the floor that it took a day and a $50 floor sander rental to correct.  Items paid for and not completed were window sill caulk and paint.  Additional damage $100. At the end of each job it became more difficult to get things redone and finally with the last two houses ultimately it was my responsibility to redo.  He did however go above and beyond my expectations at many times.  The bottom line is this, he can do things well, but if he is busy or a job drags on he may leave items sub par.  Sheetrock work was good.  framing and carpentry were good.  Painting and trim were good except for paint splatter.  He is honest, which is rare. My only complaints are that I wish he would have taken some of the work of supervision off of me and I wish he would have finished as strong as he started.

Reviews in Sycamore for Baseboard Installation

AComplete Home Repair
The job was done in a timely manner. The workers were professional and respectful during the entire time they were in our home and doing the needed work.  I would definitely use this person again if the need arises.  They were careful with my furniture and made sure that paint did not get where it does not belong. I am very thankful I found this company on Angie's List and would recommend them to others in the surrounding areas that may need work done in their home.
- Christine S....
APerformance Home Repair
He and his workers did an excellent job and the price was very reasonable. I'd recommend this company for any home repairs.
- Carrie L....
AOlive Contracting
GREAT!!!!!!!!  I will be calling them again. They did what they said they would do. Finished when they said they would finish and was very professional. They even helped us find a reputable electrician (and he was great also). We are very happy with our new living room and as I stated we will be calling them again....
- Tracy S....
AEvans Home Improvement
It went beautifully.  Blake and his helpers ripped off the old deck and took it to the landfill.  They cleaned up all the debris left by the demolition, even picked up old nails that had fallen on the ground. Installed new decking, a composite material, not wood.  The job looks beautiful.  We had them lay the board at angles, not just straight lines.  Every joint is even and in line, for every board.  The composite decking isn't as thick as the wood decking, which left lines on the posts and balusters.  Blake covered that with small pieces of wood, similar to laying baseboard.  Did a beautiful job there too, all the joints are even and tight. Again, cleaned up all debris and took it away.
- Bill L....
BB & B Residential Services
House 1 remodel went well. I received a comprehensive estimate, work was carried out in a timely manner, and inadequate repairs were brought to my standards fairly quickly. Repairs made were sheetrock, framing, finishing, painting, porch roof replacement, floor repair, siding repair, flashing installation, and linoleum installation.  After redoing the poor flashing install, siding repair and linoleum install I was satisfied.  House 2 was a simple sheetrock and paint job.  The finishing work was fine.  The painting however was rushed and in need of a second coat and I was left to repaint the area when he could not correct it in a timely manner.  Repair #2 was sheetrock repair, baseboard prime and paint.  All were done correctly.  House 3 was a difficult job which took several months.  During this time, there were very few disagreements on timeframe and scope of work which is good.  He did collect pay for jobs prior to their completion, which caused discord when items remaining were not really worth the time needed to complete them. Items done were: wall addition, laundry framing and sheetrock, finish work, painting, paneling replacement, door repair, door installation, floor repair, bead board installation, shower cement board installation, porch demo, decking and rail installation, and eave replacement.  Items of concern were cement board installation on the shower surround one inch off tub and too close to plumbing, sheetrock on the ceiling improperly installed (the crown molding was not removed and therefore there was a one inch gap between the ceiling and wall that had to be repaired), large gaps on new eaves, and some items were paid for but not completed or had to be redone included paint, touch up, pressure washing under porch, and siding repair. Upon final payment the remaining items were not attended to.  These included, painting the ceiling, painting closets, removing tape from outlet covers and painting under them.  House 4 was doorway arch, paint, ceiling repair, floor poly, flush mount light install, drain repair, dishwasher install, siding repair, window repair.  Here there was so much paint on the floor that it took me an entire day to remove.  After asking him to redo a lumpy mud job he left it to dry and did not return to prime and paint it.  Silicone was used instead of proper plumbing on the drain repair, which he did correct.  Items paid for and not completed were ceiling prime and paint, sheetrock touch up, and window repair and glazing.  Additional expense for ceiling $50.  House 5 was a simple paint job, window repair and deck pressure wash and railing replacement.  He took an extra half day to replace step tread that was fine and paint return vent covers.  There was so much paint on the floor that it took a day and a $50 floor sander rental to correct.  Items paid for and not completed were window sill caulk and paint.  Additional damage $100. At the end of each job it became more difficult to get things redone and finally with the last two houses ultimately it was my responsibility to redo.  He did however go above and beyond my expectations at many times.  The bottom line is this, he can do things well, but if he is busy or a job drags on he may leave items sub par.  Sheetrock work was good.  framing and carpentry were good.  Painting and trim were good except for paint splatter.  He is honest, which is rare. My only complaints are that I wish he would have taken some of the work of supervision off of me and I wish he would have finished as strong as he started.
- Jennifer F....