Myrtlewood Bathroom Remodel

Get quotes from professionals in your area!

N/A
0
Reviews
Business Description: Lynn Construction & Repair serves its customers with pride, integrity and attention to the details that matter most to you. This is one of the many things that sets us apart from other companies. We are locally owned and operated. Just give us a call today! General Remodeling, Kitchen Remodeler, Bathroom Remodeler, Remodeling Contractor, Remodeling Company, Home Additions, Roofing, Siding, Flooring, Basement Remodeling Eufaula AL;Clio AL;Brundidge AL;Union Springs AL;Abbeville AL
N/A
0
Reviews
Business Description: Capstone Construction LLC specializes in home building, home renovation, custom carports, additions, kitchen remodeling, bathroom remodeling, workshops, pole barns, porches, and general residential construction. No job is too small! Owner Josh Martin has been serving Atmore and surrounding areas for over 20 years in the construction industry. Our knowledgeable and experienced team is committed to completing all jobs on time and within budget. Contact us today for a free estimate!
N/A
0
Reviews
Business Description: Compass Restoration Group, LLC is a full service restoration and General Contractor providing a complete range of services from Emergency Services to Maintenance and Complete Build Back we Specialize in Insurance Repairs and Insurance Estimating. Priority Response and EMS Fire and Smoke Water damage Moisture Control and Dry out Mold Remediation Hurricanes and Storms Consulting Insurance Inspections
A
1
Review
Recent Review: The work was preformed over a 3 month period and was done to my satisfaction. Mr Dellinger has gone over and above what I would have expected as far as making sure everything was repaired to our liking. I would highly recommend Mr Dellinger's company if you have repair or remodeling needs.
N/A
1
Review
Business Description: We specialize in providing quality cabinets and granite for your kitchen and bathroom, at a low cost to our customers. We offer free installations and often have other specials that customers can ask for.
N/A
4
Reviews
Business Description: Design, build and install custom cabinetry. Home offices, kitchen and bath, entertainment centers and closets. We also provide kitchen and bathroom counter tops.
B
1
Review
Business Description: With over 20 years of experience, Prestige Construction should be your first call for all of your building and remodeling needs. We specialize Kitchen & Bathroom Remodels, Room Additions, Deck Construction and General Remodeling. Call us today for a free estimate!
N/A
5
Reviews
Business Description: Cabinet Giant is the right place for your online Kitchen Cabinets, Bathroom Vanities, Wholesale Cabinets and Factory Direct Cabinets.Discount Kitchen Cabinets, free Kitchen Cabinet design help are available.
N/A
0
Reviews
Business Description: We put the dub back in your tub.
N/A
0
Reviews
Business Description: Quality Work - Low Price

Reviews for Bathroom Remodeling in Myrtlewood

FSears Appliance Repair
We live in Calera, Alabama, and we met with sales personnel on July 26, 2014, and signed contract, and paid in full.  Personnel came out two more times of taking measurements.  We were told that it would take 4 to 6 weeks for material to come in.  Four weeks went by and we contacted company to see what the status was.  We were asked, didn't anyone contact you?  When we said no, we were told that our contract had been cancelled three and 1/2 weeks before.  When we asked why, we were told that the material we selected would cover up the bathroom window, as what we ordered was to have the back cut out where the window was, so since this material wouldn't work, the order was cancelled.  We asked why we weren't called, they didn't have an answer.  I asked where do we go from here, and was told that we'd have to upgrade to the higher priced material, and it would be $1600.00 more.  I stated that we didn't have that amount of money, and that if they would have called us before they cancelled the contract, we could have worked something out, but since we prepaid for the instillation, we used the spare money we allotted for the job on other things.  We asked if we could have the upgraded material at no cost, and Sears paying the difference because we did nothing wrong, and since Sears screwed up, we should not be punished because it was their problem.  We were told by Dennis Sorrelle, the project coordinator, that no, we would have to pay the difference.  I proposed that we split the difference, and again, we were told no.  I then asked if we could pay the difference in six payments, and again it was "no"!  I then said that we really didn't want the window blocked, but if we could get our original material, it didn't matter if the window was covered.  Dennis said, that would work, and he would be back in touch with us in a week or two. Two weeks went by, and we called, and were told that the material came in, and the back piece was broken, and they would have to reorder.  We called two more times, and were told each time, a week apart, that again, the back pieces came in broken, and again, they would have to reorder.  On the third call, I told Dennis that we felt that we should be upgraded at no cost to us because, again, none of this was our fault.  Again, we were told, "no"!  I asked for his supervisor, and Dennis told us that it didn't matter who we called, because the decision would come back to him, and he would still say "no"!  So, we again said, ok, order a new back piece.  I tried calling the Florida number, and was told that they were only the scheduling department, and we'd have to call the project manager, Dennis.  We asked for the number of the CEO of Sears Home Improvement, and we were passed on to three different locations, and the last one, we were given the name of Jay Passman, the Director in the Birmingham office.  I placed two calls to his number, left messages, and never received a return call. On Tuesday, Sept. 2, Sears called and said that all the material and parts were received, and that they could come out on Wednesday, Sept 3 to install, I said "ok".  The contractor and plumber came out yesterday, and it took 8 hours for them to complete the job.  We were not satisfied with the results, as the installer did a lousy job of fixing the drywall he cut, and mudded.  There was gaps in several areas between the wall and the top of the back panel, and damage to the bottom of the window, and I have to repair where he messed up. I would advise anyone to steer clear of the Birmingham office, and find someone else to remodel your bathroom.  In all the years we have been using contractors, this is the worst project we've ever had, and the professionalism of Sears in in question.
- Becky W....
DRoarks Construction
Initially I was very pleased with Chris. The stair project went very well......design, execution and price were perfect The bathroom went well until the last day. Chris was not there and sent his father and helper to finish up. The flooring tiles were not laid properly and are now loose. Cleanup was shoddy. But the worst incident involved the bill, which Chris had already prepared. His father asked for additional money to be added to the total to pay his rent! He wanted two checks, one for him, and one for the helper. I stupidly did this but kept very careful records of what I consider illegal practice. I then began looking closely at all of my Lowe receipts. There were additional charges on every one for water, snacks, etc, things I shouldn't have had to pay for. I discussed the situation with Chris concerning overpayment, ie the extra money for his father. I have never had a reply or the money. I would never recommend this company to anyone.
- Carol H....
ASweet Home Repairs and Remodeling
Like the other three jobs we have had Erik and his crew do, it went very well. We have a second house on the property. It is considered a pool house. We had the bathroom redone, had them add a door from the pool into the bathroom. They tore it out, put it back together with a terra-cotta tile. This job included the laundry room adjacent to the bathroom and the small covered patio that leads to the pool. Great job looked wonderful as expected. Great guys.
- Erik M....
ASweet Home Repairs and Remodeling
It went very well, Mr Denton has a very professional crew. They showed up totally gutted the entire bathroom in 4 hours. Then cleaned everything up left for the day. The next morning for 8 days and totally transformed our bathroom. Mr Denton made wonderful suggestions to help make the bathroom in to a beautiful place. we would use Mr. Denton again. Thank you again.
- Erik M....
AHarrison Construction Services
They were able to finish in half the time and with half the price I was originally quoted. It looks amazing and great quality work!
- Ashley J....
ASweet Home Repairs and Remodeling
My Bathroom was a Pepto Bismal Pink, it was God Awful! I could not keep the mold from growing in the tub and shower wall. The bathroom stunk like wet dog. I knew it was time to remodel. I contacted several local contractors and each one seemed to be a idiot or gave me the though of a used car salesman. I finally got a hold of Mr. Denton and Sweet Home Repairs and Remodeling through a friend who found him on Angieslist. I called him set an appointment and finally a contracted to do the work. Mr. Denton and his two men got my bathroom done in 2 weeks. It was a ton of work but now I am so pleased. The entire company was so professional and very clean in how they took care of my house while they tore out the bathroom.
- Linda F....
ASweet Home Repairs and Remodeling
We had two baths remodeled. At the end of each day, the cleaning and straightening up was very good. Eric kept us up to date on what the next day or two plans would be. Bath 1 was a complete tear out and replace, bath two we replaced the tub with a show and added to the closet where the original shower had been. Eric furnishes labor and you furnish the "pretty" items like fixtures, tile, towel holders. They used top of the line materials. We did ask for a couple of things, not in the original estimate and ran into a major wiring issue in the 2nd bath redo. We negotiated a price change that day, very fair, and moved on. The wiring was run midway down a wall instead of in the attic or near the ceiling. Caused some major rerouting, we didn't know so it was an understandable cost increase. Eric is an extremely fair person to deal with, he wants the job done right.
- Steven C....
APlumbing Solutions LLC
very well. fixed the toilet in the second bathroom which had been leaking. installation of fixtures was done very well and neatly. cleanup was done promptly. would do business with them again
- Redith R....
ASweet Home Repairs and Remodeling
 I had found Sweet Home Repairs through a lady I knew from church she said he was the best contractor she had ever used.  After I contacted the company he set up an appointment to see the job. He measured it and a few days later he contacted me so he could drop off the bid.  Sweet Home Repairs came in at 12500 I hired him and his company the next day. I gave a check for 6500 dollars down and got a contract in return.  I had contacted several companies and each bid varied by 1000s of dollars, I had one bid over 20,000 dollars and my lowest bid being 9000. I knew those were just not right and so I entertained a few more. From what I had been told from friends and relitives that material and labor should be 2.5 times the cost of material alone this would make my job around 12 to 13 thousand dollars. Mr Denton and his two helpers came in a gutted the whole bathroom in one day. By the time I got home from work they were gone and the bathroom was too. There was not any mess either, they had cleaned everything. The next morning Mr Denton arrived and asked where I was going to want the pot lights in the bathroom, as I pointed his helpers hung them. As I left I saw them reinsulating my walls with new fiberglass insulation and by the time I got home the bathroom had been redrywalled and covered with cement boards in the place that tile was to go. After a week of watching my bathroom develope into what I dreamed of we finally got to see tile being laid. Mr Denton laid down Hardie cement boards along with a system by Shuluter called Kerdi that went right over the cement boards this waterproof the bathroom from any leakage coming through the floor and runing any part of my house. Nine working days later all was done and my bathroom was ready to be mine again. I wrote Mr Denton a check for the remaining 6500 and we were done. I am so happy with my new bathroom and i cant wait til January cause i am going to have him do our house bathroom down stairs next.
- James B....
ASweet Home Repairs and Remodeling
I called several remodeling companies before I decided on these guys. They were very quick to respond and within a month they had us right on schedule. They came in removed our old bathroom, advised us of a few troubles and quickly repaired them. The put our bathroom back together in a timely manner and the job was complete. They were always on time and showed up each scheduled day to work. We barely went over our budget. Both men were very professional and pleasant to deal with.
- Thomas T....