Asheville Microwave Installation

Get quotes from professionals in your area!

Matching on Angie's List

how it works icon 1
Share some details about your home project.
how it works icon 2
Within moments, match with highly-rated local Pros.
how it works icon 3
Compare quotes and choose the best Pro for the job.

Reviews in Asheville to Install Microwave

AHandyman Matters of Western North Carolina
They did a great job and they were very nice. I really liked them. They got the job done in a couple of hours. The scheduling was fine and the owner even came out and checked on the job to make sure I was pleased with it. The owner was very nice.
- Melanie C....
AAsheville Remodeling Co
I am very happy! Working with Paul was really great. He was friendly, skilled, and made sure I understood what was going on. His work looks fantastic, was completed on-time and on-budget, and at a competitive rate. I'd be delighted to work with him again.
- Chris S....
AKen Swensen
Ken was pleasant and thorough in doing the estimate, made sure I knew all the things to be done, how and when they would be done.  He is kind, felt that he genuinely concerned himself with our satisfaction, that we were not just another job.  His workers were professional, came on time, were easy to work with, and did an incredibly detailed craftsman- like job. I did a considerable amount of research into the possible firms I might use, and was convinced that Ken would do a good job at a fair price.  I was in not disappointed, and would recommend him highly and without reservation to anyone in the future. Should get a POH.
- Richard P....
AHandyman Services Of Wilmington
I called Dave for an estimate, he was punctual, knowledgeable, and very professional.  He told me he would email me with the prices.  I received the email with the estimate promptly.  We arranged for the work to be done.  Dave arrived on time and worked non-stop from 9:00 a.m. until after 4:00.  He came back the following day to place the microwave on the curb for the trash for me.  I would recommend Handyman Services to anyone.  He will be returning to my home to complete additional work.  I am very pleased. I chose Dave based on the review I had read on Angie's List!!
- Mary D....
AFour Seasons Plumbing Inc
John Meyers came to our house, did an exhaustive check of existing plumbing and explained in detail exactly what he recommended for our kitchen and bath remodel.  Before he left, he provided an extremely detailed Four Seasons bid for the job, which specified that the price would not change even if extra work was necessary. The work was done at times convenient for us, making it easy to coordinate with other workers.  It was finished to our complete satisfaction, even including bringing a vacuum cleaner to clean up every speck of debris.  John took time to make friends with our nervous dog, and his good humor and positive attitude made having him working in our home a pleasure
- Prudence L....
AThe FixIt Angel JessyLynn
Jessy does great work, but phone number is not working, wish I knew how to contact her. If someone knows, please contact me, Ellen 828/658-8803.
- Ellen C....
AClassic Builders of Hendersonville
We were extremely pleased with the quality of workmanship and the professionalism exhibited by Stewart Nicholson. He came when expected, took all the time needed to insure that everything was installed properly and cleaned up after each day's work. A first class job all the way around.
- David S....
AKilowatt Electric LLC
I have used this group twice recently and can highly recommend them! I remodeled my 60’s kitchen and had some ‘unique’ wiring. Sam, the owner, was quick to respond to my call and gave a reasonable estimate of all the work needed. The crew, Ponce and Mark, were great; very knowledgeable and professional! Because this was a remodel, I needed them to come at 2 different times and I asked if the same guys could return and they did! No surprises; on time, and they cleaned up!! I will be calling the Kilowatt group again!
- Deborah C....
BSineath Construction
"How'd it go?" is the question Angie's List has posed. I will attempt to answer this question with facts and truth. The truth is the contractor business is a tough business. It is also true that I have high standards for quality and am particular in how I want things to turn out.  The truth is... ...work began on May 19 2015 and was supposed to be completed in two months according to the contract. The final inspection was on November 24, 2015. The scope of the project did change somewhat when a floor was reinforced, but  two weeks was ample time to handle the change in scope.  ...I made it clear I wanted the microwave exhaust duct installed inside the wall the sub contractors built (rather than it going up through the cabinet above the microwave) and was told it was not possible due to a truss in the attic being in the way. When I went into the attic and realized this was not true, I took measurements and photographed the truss and the duct. I met with the contractor and the project manager, discussed the issue and showed them the pictures and the work was redone the way I wanted it. ...the door to my home was left wide open when the sub contractors left on two occasions, the first overnight. On the second occasion I came home from work to find no one at the house and the door wide open. ...the project manager did not schedule the last inspection, rather my wife called it in.  ...the microwave was damaged and was installed anyway. When I discovered it was damaged, I made sure it was replaced. ...my neighbor's asphalt curb (that she paid to have made) was run over and broken apart by sub contractors leaving my house. I communicated that Sineath Construction needed to have it repaired so that it was in the same or better condition than before the damage. This communication took place on 10/26, 11/9, 11/13 and 11/20. Sineath Construction paid the invoice around 12/1. ...the completed site-finished hardwood floors were damaged on two separate occasions by sub contractors. The damaged planks were replaced and the damage is undetectable. ...my six year-old daughter and I finished installing and taping in place a roll of  "Ram Board" (a heavy paper to protect floors) on the completed hardwood floors on a Saturday morning. The project manager brought it to the house the previous day and had laid some sections down, but had not used the whole roll and had not taped it down. ...at the end of the project, there were items on the punch list that I told the contractor I would take care of instead of him sending sub contractors back to my home to take care of them. I would rather do the work myself than continue to try to manage a contractor and a project manager to get the results I want. The truth is...this is only one example of a job done by Sineath Construction. Sineath Construction has many positive reviews on Angie's List.
- David P....
ASonrisa Builders Inc.
It took about three days and lots of patience.  Correcting other people mistakes is more difficult than one might think.  Since the kitchen did not permit the moving of the microwave & wall oven to another location, you had to create something that would look acceptable and yet, permit the functioning of the kitchen drawers & doors.  All that, within the constraints of what had been done there before.  Ron rendered a magnificent look to that area of the kitchen.  He's very patient, resourceful & determined. The same qualities apply to the installation of the External Vented Island Range Hood.  Some important installation documentations were missing but that did not stop Ron's ambition to go for it.  He also seemed to have all the tools needed close at hand.  He completed the fixing of the perpendicular support wall into proper position, in the most efficient and economical fashion.  Ron applied the same efficiency in finishing other carpentry touches that were needed. 9Ron is also very punctual, dependable, polite, and share easily and generously resourceful informations.
- Andree H....

Handyman Services in Asheville

Angie's List : Local Reviews : Handymen : Asheville : Asheville Handyman Services : Asheville Microwave Installation
B
6
Reviews
Recent Review: They did a great job and they were very nice. I really liked them. They got the job done in a couple of hours. The scheduling was fine and the owner even came out and checked on the job to make sure I was pleased with it. The owner was very nice.
A
24
Reviews
Recent Review: I am very happy! Working with Paul was really great. He was friendly, skilled, and made sure I understood what was going on. His work looks fantastic, was completed on-time and on-budget, and at a competitive rate. I'd be delighted to work with him again.
A
291
Reviews
Recent Review: Good quality and quick.
A
519
Reviews
Recent Review: John Meyers came to our house, did an exhaustive check of existing plumbing and explained in detail exactly what he recommended for our kitchen and bath remodel.  Before he left, he provided an extremely detailed Four Seasons bid for the job, which specified that the price would not change even if extra work was necessary. The work was done at times convenient for us, making it easy to coordinate with other workers.  It was finished to our complete satisfaction, even including bringing a vacuum cleaner to clean up every speck of debris.  John took time to make friends with our nervous dog, and his good humor and positive attitude made having him working in our home a pleasure
A
1
Review
Recent Review: Jessy does great work, but phone number is not working, wish I knew how to contact her. If someone knows, please contact me, Ellen 828/658-8803.
A
43
Reviews
Recent Review: We were extremely pleased with the quality of workmanship and the professionalism exhibited by Stewart Nicholson. He came when expected, took all the time needed to insure that everything was installed properly and cleaned up after each day's work. A first class job all the way around.
A
81
Reviews
angies list certifiedAngie's List Certified
Award 2020Super Service Award
offers couponOffers Coupon
Recent Review: I have used this group twice recently and can highly recommend them! I remodeled my 60’s kitchen and had some ‘unique’ wiring. Sam, the owner, was quick to respond to my call and gave a reasonable estimate of all the work needed. The crew, Ponce and Mark, were great; very knowledgeable and professional! Because this was a remodel, I needed them to come at 2 different times and I asked if the same guys could return and they did! No surprises; on time, and they cleaned up!! I will be calling the Kilowatt group again!
A
7
Reviews
Recent Review: "How'd it go?" is the question Angie's List has posed. I will attempt to answer this question with facts and truth. The truth is the contractor business is a tough business. It is also true that I have high standards for quality and am particular in how I want things to turn out.  The truth is... ...work began on May 19 2015 and was supposed to be completed in two months according to the contract. The final inspection was on November 24, 2015. The scope of the project did change somewhat when a floor was reinforced, but  two weeks was ample time to handle the change in scope.  ...I made it clear I wanted the microwave exhaust duct installed inside the wall the sub contractors built (rather than it going up through the cabinet above the microwave) and was told it was not possible due to a truss in the attic being in the way. When I went into the attic and realized this was not true, I took measurements and photographed the truss and the duct. I met with the contractor and the project manager, discussed the issue and showed them the pictures and the work was redone the way I wanted it. ...the door to my home was left wide open when the sub contractors left on two occasions, the first overnight. On the second occasion I came home from work to find no one at the house and the door wide open. ...the project manager did not schedule the last inspection, rather my wife called it in.  ...the microwave was damaged and was installed anyway. When I discovered it was damaged, I made sure it was replaced. ...my neighbor's asphalt curb (that she paid to have made) was run over and broken apart by sub contractors leaving my house. I communicated that Sineath Construction needed to have it repaired so that it was in the same or better condition than before the damage. This communication took place on 10/26, 11/9, 11/13 and 11/20. Sineath Construction paid the invoice around 12/1. ...the completed site-finished hardwood floors were damaged on two separate occasions by sub contractors. The damaged planks were replaced and the damage is undetectable. ...my six year-old daughter and I finished installing and taping in place a roll of  "Ram Board" (a heavy paper to protect floors) on the completed hardwood floors on a Saturday morning. The project manager brought it to the house the previous day and had laid some sections down, but had not used the whole roll and had not taped it down. ...at the end of the project, there were items on the punch list that I told the contractor I would take care of instead of him sending sub contractors back to my home to take care of them. I would rather do the work myself than continue to try to manage a contractor and a project manager to get the results I want. The truth is...this is only one example of a job done by Sineath Construction. Sineath Construction has many positive reviews on Angie's List.