-Find top-rated Service Providers

Find Top-Rated Lovell Lumber Stores

Angie's List helps you hire the best - and avoid the rest!

Lumber Stores to Avoid

9

Top Rated Lumber Stores

3

Prevent buyer's remorse with us

  • Over 3 million people trust Angie's List to help make the right choice
  • Be informed to avoid costly mistakes
  • Shop with us to ensure a fair price
  • Our complaint resolution team will help if a project goes bad
+See Verified Local Reviews

Over 187 reviews for
Lovell Lumber Stores from people just like you.

D
"Made initial inquiry in December 2014, wrote contract early
2015. Received phone call all materials were in they would deliver
" 31, called and reminded store, my house is a small house, no room to store construction materials. OK, will keep at store, no worries. Tell store I am going out of town 2/5-2/12. No problems, they are bonded, perfect time to do
. They would keep me informed via e-mail, phone, text etc. No such communication happened. Adult son at home, sent message to me that they did demo the bath and vanity 2/9/15, planned to have electric install heated towel bar on tues. OK, then put tub in which was difficult. No more work. I arrive home late Thursday 12, to find my master bedroom packed with all construction materials, My small drive over 1/2 consumed by and enormous waste receptacle. Nothing much in the waste receptacle (no bathtub etc). Friday I call and complain. they come out and make a path to my bed through my bedroom but leave used toilet, which had to be removed to accommodate tub, but it was left sitting at head of my bed. I call and complain, they come out and moved it soaking the new bedroom carpet with toilet water. They removed the door to my adult son' s bedroom as demo, but door swung wrong way, they couldn't replace his door so after a week tension was so high in house he left. He has mental health issues and he just couldn't stand the lack of privacy. The work they have done so far has been sub par, the dry wall looks like an
. It is now Mar 3rd they removed the dumpster today. I took it upon myself to find different shower head because they told me a drain head w hand held wand was not possible, but did not offer other options. I have found what I want and although pricey, I will purchase and have it installed by a real plumber or contractor. The sink faucet per the pm, has been on back order due to inclimate weather up north. That has been at least 4 wks. So I went to the
on
and chose one that is "in stock" that they can install and so they get out of my house. My son's door should be available this week they hope and they hope they can get all done by this Friday. The door is suppose to be in Tuesday or Wednesday, but it is not convenient for him to get his crew here until Friday. This whole project has been a relentless nightmare.. In the end I will be left with a crappy product, that is not what I wanted and I am totally dissatisfied with. When I can save the money once again, I will have to have it redone.

-BeaJay L.

F
"It couldn't have gone worse. He will not tell us where our money is. We have spoken to the subcontractors who were paid some but not all of their money and" are now calling and demanding payment although we had nothing to do with hiring him. we've demanded numerous times that he give us an itemized bill and he refuses. He has kept all our money though the subs were paid only around $15K. BEWARE OF THIS GUY! I cannot believe that we have gotten ripped off in this way.

-Felice F.

+Join 2 Million People on Angie's List

Over 2 million people trust Angie's List.

  • Your Membership Includes:
  • Instant access to top rated businesses covering 700+ services
  • Our Complaint Resolution Team to help when a project goes bad
  • On-the-go access to our iPhone, Android, & iPad apps
Find top-rated Service Providers
See Verified Local Reviews
Join 2 Million People on Angie's List

Local Articles in Lovell

No deck staining product lasts forever. But a quality brand will give you a lot more time to enjoy your deck before you have to stain it again. (Photo courtesy of Angie's List member Jill K. of Los Angeles)
Hardware & Home Improvement Stores

Opting for the least-expensive paint, gutters or other items may cost you more in the long run.

When choosing a drill, remember that size doesn't matter as much as voltage. A good drill will cost more, but the battery won't wear out while it's not in use. (Photo by Eldon Lindsay)
Hardware & Home Improvement Stores

Quality power tools, ladders and ratchet sets aren’t just for the professionals. Handy homeowners should spend their time and money on tools that work.

Angie's List
Architects & Building Design, Billiard Table Repair, Billiard Table Sales, Builders - Homes, Carpentry - Unfinished, Carpentry - Woodworking, Closets, Entertainment/Parties, Epoxy Flooring, Handymen, Hardware & Home Improvement Stores, Interior Design & Decorating, Remodeling - Basements, Remodeling - General, Stereo & Home Theater Systems, TV Sales, TV Service - Cable, TV Service - Satellite

Consider your home's layout to decide if an existing space can be converted into a game room or if you'll need to add on.

Angie's List
Auto Sales, Hardware & Home Improvement Stores, Lawn Mower & Power Tool Repair, Rentals - Cars

Car-sharing programs can reduce greenhouse gas emissions by taking more cars off the road and reducing traffic congestion.

Angie's Answers

?
Todd said it best.

An itemized list / cost breakdown, more often than not is used against the contractor when it is shared with other builders who will then beat it.

Good contractors use good people, and good people cost more.  Just the cost of having the appropriate insurance / bond can be the difference between winning a job or losing it ot a 'lower bid'.

It is the rule of three; there is Good, Cheap and Fast.  You can have any two:  Good and Cheap, won't be Fast; Good and Fast, won't be Cheap;  Cheap and Fast, won't be Good!

When comparing bids, it isn't the cheapest or the 'nicest' person you should select.   You should understand why there is a large price difference (it shows there are gaps in your design program or what you have asked for specifically, which means there may be arguments later).  If most of the bids are in line, and one is way high or way low,  you want to know why before dismissing or selecting them.

A price-only decision almost always costs more in the long run. 

Good luck!
?
There are two sides to this and everyone will have an opinion.  I can tell you that from a contractor's point of view a customer that is up front with me is much easier to work with and the entire experience is much more pleasurable to all parties involved.  If you treat your contractor like there's always something to hide from him expect the same in return.  A good contractor is going to take your budget into consideration and make recommendations based on that budget.  When possible, he's going to estimate the work 10-20% under your target to leave room for the unexpected.  With any remodeling work, there's always the possibility and likelihood that there will be surprises that will have to be added such as mold damage, improper existing framing, etc.  The cushion allows room for the project cost to grow without going over your budget.  If no problems are found and you decide to spend that money some of the final finishes can be upgraded or other projects added.

Another good arguement for disclosing your budget to your contractor is to save you both some time and aggrevation.  You may have a $10,000 budget and want $30,000 worth of work.  Wouldn't you like to know your desires aren't possible before you get your hopes up or spend money on design fees for plans you can't afford?  Likewise, the contractor doesn't want to put in the hours of calculating the estimate only to find out it was all for nothing or that he has to refigure for a much lower cost after pricing what you specified.

Be fair and honest with your contractor if you expect the same respect in return.  You'll get a lot more out of it with the right contractor.

Todd Shell
Todd's Home Services
San Antonio, TX
?

Herlonginc's answer stated that it is not the contractor's job to pay for materials and labor to do the job. I say baloney - a reputable, established contractor has the funds (or a business operations line of credit) to "carry" the job between interim or partial payments, each of which should be keyed to completion of distinct easily measured mileposts in the job, and for a homeowner I would say should be in not more than 20% increments for jobs exceeding a week or so. For shorter jobs, then an initial payment, 50% completion, and completion would be normal. His cost of carry funds is part of his cost of doing business, and is figured as part of his overhead.Bear in mind when he is buying materials and paying labor, his materials he typically pays for on a 10-30 day invoice, and his labor typically a week or two after they work, so he is not really "fronting" that much money if you are giving him weekly or biweekly interim payments, on a typical residential job.

If he does not have the funds to buy materials (excepting possibly deposit on special-order or luxury items, which still typically are 10-30 day invoiceable to him) and hire personnel then he is a fly-by-night operation, and he should not be bidding that size job. You should never (other than MAYBE an earnest deposit of not more than the LESSER of 10% or $5000) let the payments get ahead of the approved/inspected work progress - typically payment should be 10-20% BEHIND the progress, with at least 10% retained at the effective end of work until final inspections and completion of the final "punchlist".

That promotes rapid continuation of the work, discourages the all-too common nightmare of contractors taking on more work than they can handle so they leave your job for weeks or months to go work on someone else's job (frequently to start that someone else's new job so he can get the job), and does not leave you out a tremendous amount of cash if he does not finish and you have to hire another contractor to finish the job. Remember, if you have to hire a new contractor to finish the job, he will charge you a lot more than the original bid to finish someone else's unfinished mess.

This may seem cynical, but having started in the construction business about 50 years ago and seeing the shenanigans that a lot of contractors pull you cannot be too safe. You have to remember contractors are like any other people - I would say maybe 10% are outright crooks, another 25% or so will pull a fast one or overcharge if the opportunity presents itself, maybe 30% will do the work but not any better than they are forced to, about 25% are good conscientious reputable workmen, and the last 10% or so are really spectacular - conscientious, fair, and efficient craftsmen. This top 35% are the only ones you should have bidding in the first place. Therefore, only get bids from long-term reputable firms (so you shake out the marginal short-timers with less experience and also generally less ability to finish the job on budget and schedule), only those that have good RECENT references, and preferably with excellent word-of-mouth recommendation from people you know and trust. That way, you are starting right off with the cream of the crop, so hopefully whichever one bids low should be a good choice.

NEVER start with bids, then check the references of the low bidder - why even consider a vendor or contractor who you do not have faith in from the start ? Get references and short-list you possibles BEFORE you ask for bids.

Low bids - that is another matter - commonly the low bidder is NOT who you want, especially if he is significantly lower than several others, which might mean he is desperate for work, made a math error, or did not correctly figure the entire scope of work. You want a reasonable bid with someone you connect with and trust - that is worth a lot more in the success of the job than the absolute lowest bid.

 

?
You should always get a set of print and pull a permit when remodeling you home. It is a good thing that you want to be involved in your project. I do have some reservation about the electrical work. There is a lot at risk with doing the work yourself. If the house burns down you will never get the insurance money, unless your a certified electrician. Now of days 90% of home fires are blamed on electrical problems because the insurance company is to lazy and cheap to investigate the true problem. Also find out if the city you live in will allow you to perform the work. Make sure you coordinate your subs to have the proper time and space to perform their job. You don't want people working on top of each other. If you order all you materials make sure everything is there before you start your project. Have your subs check for proper and full items to be installed. Make sure every sub has a working set of prints. Make sure you have all the demo done before your subs show up to work. Schedule your plumber first, do any final framing or electrical work while you wait for inspection. Electrical inspection next followed by framing, insulation, and wallboard. All subs must get a final inspection on the job before you (the GC) can call in your final inspection.
?
The answer depends on your contract.  If you do not have a written contract, you need to begin documenting everything.  Begin by using a calendar and marking the days the contractor started, worked, you had to speak to him/her about the work, etc.

Next photograph the work you feel is sub-par.  If work has been corrected, photograph it now to have a record of its condition.  If you have any "original" or "before work began" pictures get those together, too.

If you do have written contract, see what it says about warranties, complaints, failure to finish / comply, etc.  Holding the money may end up with the contractor taking YOU to court for the funds - you cannot just hold the money.  You need to document in writing what is wrong, what you expect to happen (be specific) and when it should happen by.  A good contract will explain if and how money can be held, how the arbitration or complaint is filed, etc.

You should also invite another contractor to come in and bid the work to finish the job.  They can confirm the quality of the work and give you a price to fix / finish the job.  This gives you justification for holding the funds and an option to finish the job.

If the contractor is not willing to fix the work or listen to direction, do not allow them back in the house.  A judge will ask you why you let them continue to do work if you found it unacceptable.  Take back the key or access to the building - you can also attempt holding any materials or tools as collateral if the cost of repair is higher than the amount owed.  Again, document what you are holding, its estimated value (google or ebay search), etc.

Finally, in writing you should fire the contractor and state the exact reason(s).  Document everything; if it is done in person after they leave make notes of what was said, agreed upon and disputed.  If you are satisfied that what you have paid is fair compensation for the work done, make sure this is noted in the letter firing the contractor.  If you feel money is owed, you will need to file a small claim in your local court.  Include the documentation you made, notes, letters, etc. when you file your claim so the judge will have a copy of everything.  Don't forget to contact the BBB.

Do not wait for the court date; go ahead and hire the other contractor and have the work completed.  Bring this invoice to court with you (file it before the court date if you can).  Bring photos of the finished work (again, file it with the court before the date if possible).  You must show what good quality work looks like vs the poor quality work.

Otherwise it will be a your word against the contractor and you will most likely lose, (the contract is a promise to pay for work) or even if you "win" you will most likely split the difference between the argued amount of money.  Also be prepared for the contractor to file a small court claim against you.  Same process as above, except now you will respond to the summons with a copy of your stuff to defend your reason for holding funds instead of asking for money back.

Good luck!
?
Yes, you can ask for these items.  Second Century Homes answered your question well - most contractors do not do a break down to prevent haggling on items that shouldn't be part of the discussion.  People sometimes forget to allow the builder to make money. . .  Builders also want the entire job, not the nickle and dime menu selected items - you may find the contractor says "Thanks, but no thanks" if you ask them to remove portions of the work.

The real question is why do you need this break down?  If you are thinking you will do the demo yourself to save money, you can certainly tell your contractor this - but I would be willing to bet once you buy or rent the tools, haul the trash to the correct disposal dump (many trash dumps will not take home building materials anymore) and clean up / prep for the new work - you will have spent more and delayed the project more than just letting the professionals do it. Plus, do not be surprised when they still have to do additional demo work that you didn't know would be needed to complete the job, etc.

Also keep in mind that cutting portions of the work out of the job to do later is not a money saving move.  You will find that the cost for the individual items go up when done seperately - the contractor has to come back multiple times, has to set the equipment back up, possibly pull seperate permits, schedule the work crew / subs, etc.

If you are asking for the break down to compare bids, then again, tell the contractors what numbers you want to see.  If you are doing it because you feel the total price is too high, have a discussion with your contractor; they may be able to suggest ways to save costs, etc.  Ultimately if you know the materail costs, and have the total figure, you can do a pretty good estimate of the percentage for labor and profit in the job.

It is your project and your contract, so you can ask for anything you want on the quote - just be clear on why you want the information so the contractor can work with you.

Good luck!

Home Improvement Store reviews in Lovell

D

Rating
I will never use any contractor through
Lovell Lumber Stores Provider Name Locked
. Make sure you see the contract before they do anything and the unit they promise to install is same they told you. Make sure that you get a break down on all the units cost and labor cost.
- Marco M.
F

Rating
I should have know right off the bat that this want going to end well for me. I went to HD to see about getting an appointment to estimate refacing all me cabinets. At first the lady at HD said they no longer offer this service as the cabinet refacing company had a lot of issues and HD was no longer using them. As I browsed around the store the lady approached me to let me know that in fact they were offering this service once again. I set a time to get a cabinet refacing estimate. well they never showed up so I called the hotline which
Lovell Lumber Stores Provider Name Locked
me nowhere. A day later the cabinet company called me to reschedule as they got busy and missed it. I asked why not a heads up call as I stayed home all day. All they could say is sorry and wanted to reschedule. I told them I would not be using them because obviously my business was not important.
- Joseph D.
A

Rating
Lovell Lumber Stores Provider Name Locked
installed the generator and it works perfectly. Our power went off about two weeks after the installation just as guests were arriving for dinner. The generator came right on and worked perfectly. Previously our power had been off for three weeks and we lost everything in our very large freezer plus, due to the heat, we had to stay in a hotel. We have
Lovell Lumber Stores Provider Name Locked
servicing it twice a year to be sure spark plugs are okay because we don't want to fool with it.
- MARTHA K.
D

Rating
I ordered a 22ft wide X 26 ft long carport in October 16 2013 and it was delivered and installed October 30 2013.
Lovell Lumber Stores Provider Name Locked
Manufacturing did not show up the day that they were scheduled to install it and missed another installation appointment before finally arriving on the third date.
On 2-16-2015 a snow storm produced approx 10 to 11 inches of snow and on 2-18-2015 the carport collapsed onto my ford 4x4 pickup and GMC Yukon Denali damaging both. The trusses on the carport collapsed as well as the wall supports. Three other
Lovell Lumber Stores Provider Name Locked
collapsed in my county that was manufactured by
Lovell Lumber Stores Provider Name Locked
Manufacturing Inc. but those manufactured by their competitor
Lovell Lumber Stores Provider Name Locked
did not collapse. The problem is a combination of not enough truss supports and the thin gauge (14ga round ) posts. The carport was not engineered to withstand snow or a mixture of snow and wind. If you live in an area where it snows buy your carport from another manufacturer.
- jackie J.
A

Rating
We were very happy with the price and the quality of the work provided. Our snow blower is working better than ever. He came and picked the snow blower up at the house and dropped it back off. It did take longer than we'd hoped to get the snow blower back, and we didn't always hear from him as promptly as we would've liked, but the work was great. It was also a very busy time, with a lot of heavy snowfalls, so that probably affected how fast he could get in touch.
- Suzanne B.
B

Rating
The process to obtain new windows began by calling the Porterville
Lovell Lumber Stores Provider Name Locked
who in turn notified their Windows Installation representative who is out of Reedly. I received a call from the representative within an hour and was able to make an appointment. I met with the representative twice before making a decision. His patience and willingness to answer an hour of questions influenced my decision to go with
Lovell Lumber Stores Provider Name Locked
. Upon signing the paperwork required to initiate the installation process (Friday 9/19/14), I was given 3 business days to cancel without obligation or penalty. Monday, 9/29/14, I received a call from the
Lovell Lumber Stores Provider Name Locked
window installer out of Fresno to set up an appointment to measure for new windows. During the appointment, the installer was pleasant, professional and informed me that he would also be installing the windows. Tuesday, 10/14/14, I was contacted by
Lovell Lumber Stores Provider Name Locked
-at-home Services and an installation date was scheduled. Friday, 10/17/14, I received another call from
Lovell Lumber Stores Provider Name Locked
-at-home Services asking if I had scheduled the installation. I informed the representative that an appointment was scheduled for Friday 10/24/14. He mentioned that apparently the date had not been entered into the system and he would do so. Monday, 10/20/14, I received a call from Done-Right-Construction out of Bakersfield. They informed me that they would be installing the windows for
Lovell Lumber Stores Provider Name Locked
but were booked on Friday 10/24/14 and asked if I was willing to reschedule to Saturday 10/25/14. Once Done-Right-Construction began handling scheduling, the scheduling process proceeded smoothly. Installation process The crew arrived on time. They were professional, yet personable. The sliding glass window/door required extensive assembly prior to installation. I was informed that there is an additional assembly fee for a window requiring this amount of assembly. However, the company was kind enough to wave the fee. The crew discovered that the ordered windows were too large to fit into the home’s existing aluminum frames. The existing aluminum frames had to be removed and replaced with new vinyl frames (that actually matched the vinyl frames of the replacement windows). I am aware that tearing out old frames is risky. However, the crew did not run into any problems and I was actually glad to see the old frames go. Seven windows and a huge sliding glass window/door was installed by around 4:00 in the afternoon. Attention was paid to detail and the contractor did not release workers from their jobs until it met his approval. Upon completion, areas were vacuumed and outdoor areas were swept up. Following installation, I found no major structural damage or other problems. In the following weeks, I only found two or three things that only needed a quick cosmetic fix such as chipped paint or smudges on the windows. It has been several months since the installation and I have not had any problems. I am very pleased with the windows.
- Christopher N.
A

Rating
Lovell Lumber Stores Provider Name Locked
subcontracts these
Lovell Lumber Stores Provider Name Locked
installations. The sales associate at the Woburn
Lovell Lumber Stores Provider Name Locked
who assisted us was excellent. He spent alot of time with us explaining the product and process. He then came to our house and measured all of the windows, wrote up the quote and even helped us increase our credit line at Lowe's to cover the cost ! They had a no interest for 12 months program we took advantage of. The subcontracter was then scheduled to come to our home and check the measurements to make sure of the sizes and evaluate the job. He showed up on time and was efficient in his task. He informed us that it would be a two day job with two men. The order was placed and we were given an approximate date for the install (the windows are manufactured to order in Minnesota). When the windows were shipped,
Lovell Lumber Stores Provider Name Locked
called and gave us the date and time. The crew of two men showed up ON TIME both days and conducted themselves in a professional manner at all times. They were respectful of our property and cleaned up all the debris.
- Ann Marie N.
D

Rating
- Left us in the lurch.
- High retail plus pricing for tile
- No tile layout provided by designer.
- Failed to help us with follow on order to fix the shoddy installation
I wouldn't depend on them
- Mark V.

All Lumber Stores in Lovell, WY

Companies below are listed in alphabetical order. To view top rated service providers along with reviews and ratings, Join Angie's List Now!

A D Martin Do it Best Lumber

110 W Main St
Riverton

B & G GOLDEN RULE LUMBER

143 E MAIN ST
Lovell

C K HARDWARE

70 E MAIN ST
Lovell

DirectBuy of Indianapolis

8450 Westfield Blvd

DZ Home Improvement LLC

5197 Emmeline Drive

FRONTIER SIDING SUPPLY

1721 PACIFIC AVE
Cheyenne

RepairClinic.com Inc

48600 Michigan Ave

RIS Insulation Supply

5160 Havana Street

Wyoming Building Supply

2104 Fairgrounds Rd
Casper

Join Angie's List to get the best local reviews in Lovell.

What Does My Membership Include?
  • Instant access to reviews for 700+ services
  • Exclusive service discounts - up to 70 percent off!
  • Top-notch support from our live call center
How does Angie's List work?
1. Say you need a Home Improvement Stores
2. Angie's List has tons of detailed, local reviews.
3. Find a winner, and book them.
4. Angie's List is there to resolve any issues.
CBS
Good Morning America
Fox News
USA Today
The Wall Street Journal
MSN money